My WebLink
|
Help
|
About
|
Sign Out
29
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
062122
>
29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:30:55 AM
Creation date
6/17/2022 11:12:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/21/2022
DESTRUCT DATE
15Y
Document Relationships
29 ATTACHMENT 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\062122
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Funding for Existing City Council Priority Projects <br /> • Century House Facility Repair $4,643,500 <br /> • West Las Positas Boulevard Repairs 2,500,000 <br /> • Skatepark 2,000,000 <br /> • Library Roof Replacement 525,000 <br /> • Library Lighting 400,000 <br /> • Pleasanton Cricket Pitch & Field 250,000 <br /> At a Budget Workshop on May 31, 2022, City Council provided staff with direction on <br /> two capital projects and use of Rainy Day reserve funds. <br /> • Increase the funding for the Century House Facility Repair project from the <br /> proposed $1.7 million to $4.8 million to facilitate full funding and completion of <br /> the project <br /> • Decrease the Skatepark project from the proposed $3.0 million to $2.0 million to <br /> offset some of the Century House Facility Repair project allocation <br /> • Transfer an amount not exceeding $2.0 million dollars from the Rainy Day Fund <br /> to address the balance of allocation for the Century House Facility Repair <br /> project. <br /> Following the budget workshop, the review of bid proposals for the library roof <br /> replacement project provided cost estimates that were significantly lower than the <br /> original engineering estimates — approximately $525,000 instead of $2.7 million, a <br /> difference of $2.2 million. This change is reflected in the Additional Funding for Existing <br /> City Council Priority Projercts list shown above. Based on this reduction in costs, the <br /> transfer of $2.0 million from the Rainy Day Fund reserve is no longer necessary to fully <br /> fund the Council's identified projects for the Mid-Term CIP. <br /> With this, staff is recommending that at this time no funding be transferred from the <br /> Rainy Day reserve. Accordingly, the FY 2022/23 Mid-Term Update being presented for <br /> adoption, provided as Attachment 2, includes the Council's direction on funding levels <br /> for the Century House Facility Repairs and Skatepark projects, but not the transfer from <br /> the Rainy Day Fund. <br /> This City of Pleasanton's General fund reserve policy is to maintain minimum reserves <br /> equal to 20 percent of operating expenses, a maximum of 30 percent and a target of 25 <br /> percent. The current proposed budget is reflecting a reserve of 30.7% as shown below. <br /> FY 2022/23 Percent of <br /> Mid-Term Budget Operating <br /> Total General Fund Reserve $41,009,121 30.7% <br /> Should Council determine to use Rainy Day reserve funds as discussed and directed at <br /> the budget workshop, two alternatives are provided: <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.