My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
062122
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 8:15:28 AM
Creation date
6/17/2022 8:09:10 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/21/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Costco has expressed an interest in locating one of its stores in the JDEDZ and <br />has indicated a willingness to assist the City in designing and constructing the Project <br />Improvements, subject to the terms and conditions of this Agreement. The City and Costco <br />intend to enter into a separate Improvement Agreement to govern the process and timing of <br />Costco's construction of the Project improvements. <br />G. The City estimates that the cost for the acquisition of the Required Right of Way <br />and for the design and construction of the Project Improvements is $21,470,000 ("Preliminary <br />Cost Estimate"). This cost estimate includes an estimated amount to design and construct the <br />JDEDZ Street improvements of S12,860,000; an estimated amount to design, construct and <br />acquire the right of way for the Stoneridge Drive and I-680 Project of 57,110,000 and an <br />estimated amount to acquire the Required Right of Way of S 1,500,000. Attachment 4 provides a <br />breakdown of the Preliminary Cost Estimate for the Project improvements. <br />H. Costco intends to advance the costs for the development of the Project <br />Improvements and the City intends to reimburse Costco a portion of Costco's expenditures <br />incurred in designing and constructing the Project Improvements so that, after such <br />reimbursement, Costco shall have borne only its fair share of impact mitigation costs in the <br />amount to $6,785,000, based on its proportionate impacts on JDEDZ traffic, (the "Costco Fair <br />Share"). Costco shall pay the Costco Fair Share as follows: (1) $3,700,000 will be used for <br />Project Improvement costs in lieu of paying the City's Traffic Development Fee, and (2) <br />$3,085,000 will be incurred and contributed by Costco towards the design and construction costs <br />of the Project Improvements. <br />I. Furthermore, Costco shal I advance all additional costs for the design and <br />construction of the Project Improvements, subject to reimbursement by the City, as provided for <br />in Section 4.1. <br />J. The Required Right of Way will be determined during the design phase of Project <br />Improvements. Costco will dedicate the Costco Right of Way to the City at no cost to the City. <br />Costco shall be responsible for fifty percent (50%) of the cost of acquiring the remaining <br />Required Right of Way, and the City shall be responsible for the other fifty percent (50%). <br />Costco will be reimbursed the Costco Acquisition Costs as provided in Section 4.2. <br />K. The costs for right of way for Stoneridge Drive and 1-680 Project Right of Way is <br />included in the $7,110,000 Stoneridge Drive and I-680 Project estimate and will not be <br />considered part of Costco Acquisition Costs. Reimbursement of Costco expenditures made for <br />the Stoneridge Drive and I-680 Project will be made in accordance with Article 4. <br />L. The amount the City intends to reimburse Costco pursuant to this Agreement will <br />not exceed the Costco Construction Costs (plus any accrued interest) and the Costco Acquisition <br />Costs. The City will maintain no proprietary interest in the proposed Costco Store. <br />2 <br />131001\2218870.8 <br />2M2o18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.