Laserfiche WebLink
emergency repair costs or the eventual capital replacement cost of irrigation systems, <br />planting in the general benefit area, masonry walls, and any additional emergency repair <br />services or other required improvements. <br />The fund balance for capital repair and replacement is approximately $83,000 for this <br />district. This amount is not enough for several improvements for which replacement must <br />be considered in the near term. The improvements consist of an extensive irrigation <br />system replacement and plant replacement, tree pruning, and other features. <br />Additionally, this amount is insufficient to repair the existing sound wall if it needs repair <br />in the future. <br />With the assessment of one City -owned parcel ($16.62), and the cost of maintenance <br />for the "general benefit" area along the Alamo Canal ($9,703) that was in the LIVID when <br />it was originally formed but later determined to be a general benefit requiring City <br />maintenance, the City will be responsible for $9,720 of the maintenance within the <br />district area. <br />Lighting ting and Landscape Maintenance District 1993-1, Windsor <br />The Windsor subdivision (District 1993-1) has 90 parcels. The district has been in place <br />for 29 years. Maintenance in this district includes masonry walls, trees, shrubbery, <br />groundcover, irrigation systems, entry features and common area drainage ditches along <br />with furnishing all water and power for the irrigation system, situated in Lot A, on the <br />northeast side of Tapestry Way and Minton Court, and in the northwest corner of the <br />subdivision, and also Lot C in the southwest corner of the subdivision, Tract 6320 in the <br />city of Pleasanton. <br />The assessments for the coming year for Windsor will be the same as last year at <br />$269.62 per each privately -owned parcel. With a total of 90 parcels in the district, this <br />year's total assessment will be $24,265.80. This amount is not enough to fund the <br />maintenance of the district areas to the same level of maintenance as in past years. The <br />County assessment fee will continue to be paid, as will the City administration fee. Due <br />to the ever-increasing cost of water and maintenance services, and because of the aging <br />plant material, irrigation system, and improvements, the cash reserve for the district has <br />been depleted. Major breaks in the irrigation system have led to significant water loss, <br />high water bills, and expensive repairs each of the last two years. <br />City staff continues to work closely with the maintenance contractor to reduce water loss <br />due to the aging irrigation system and to increase the efficiency of landscape <br />maintenance operations. However, at this time there is no alternative but to reduce the <br />amount spent on the maintenance contract, specifically the labor hours spent on <br />maintenance, in order to maintain a balanced operational budget. There is no funding <br />available to cover capital repair and/or replacement costs, nor is there sufficient funding <br />to cover emergency repair costs. <br />Despite a significant reduction in the level of maintenance of the landscaped areas, there <br />is a fund deficit of approximately $19,000 for this district due to the significant irrigation <br />breaks and repairs that have been required over the last few years. <br />Page 3 of 7 <br />