My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 4:04:13 PM
Creation date
6/2/2022 4:03:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements in Attachment 2. Large broadleaf weeds shall be controlled either <br /> chemically or manually removed. <br /> 3.03 Debris Control <br /> A. All clippings, trimmings, cuttings, trash and rubbish associated with landscape <br /> maintenance shall be promptly removed from the site. <br /> B. The property shall be toured each visit to pick up and dispose of debris such as <br /> bottles, papers, cartons, and similar items to keep the grounds neat in appearance. <br /> C. Large items of debris, such as large appliances or couches, abandoned on the <br /> properties by others shall be removed to a suitable dump site by the City or by <br /> the Contractor as Extra Work if approved by the City. Notify the City <br /> immediately when such dumping occurs. <br /> 3.04 Irrigation System Care <br /> All irrigation systems shall be checked and adjusted each Spring and periodically <br /> throughout the growing season. Clean filter screens on pumps,backflow devices and <br /> drip systems as needed. All heads and valves flagged for repairs shall be repaired within <br /> one watering period or two working days—whichever is the shorter time frame. <br /> Necessary repairs to clocks, wiring, or necessary system modifications will be brought to <br /> the attention of the City for authorization to proceed with repairs or replacement. Cost <br /> estimates shall be provided by the Contractor. All repairs to the irrigation system shall be <br /> made within one watering period or within two working days from observation of <br /> damage. If repairs take longer than that,the contractor is responsible for hand watering <br /> the plant material as necessary to keep it in a healthy unstressed condition. <br /> A. Any damages to system caused by Contractor's operations shall be repaired <br /> without charge to the City. Repairs shall be made within one watering period <br /> or immediately upon discovery. Upon notification from the City of the <br /> damage it shall be repaired within one watering period or within two working <br /> days, whichever is shorter. Contractor shall report such damage immediately <br /> to the City. <br /> B. Accidental damage such as reported cases of vandalism shall be reported <br /> promptly to the City,together with an estimate of costs for repairs. This <br /> applies also to changes and additions needed. Faulty electrical controllers <br /> shall be reported to the City, and upon approval, repairs shall be made by the <br /> Contractor at City expense. In any case, repairs shall be made within one <br /> watering period or within two working days, whichever is shorter. <br /> C. In early spring, Contractor shall check all systems for proper operation. <br /> Lateral lines shall be flushed out after removing the last sprinkler head or two <br /> at each end of the lateral. All heads are to be adjusted as necessary for <br /> unimpeded coverage. <br /> Exhibit A-Scope of Work 2022 <br /> Rev.4/29/2022 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.