Engineer's Estimate of$3,160,000. A review of the bids identified mathematical errors in <br /> three of the five received bids. The bids were corrected based on the unit prices per the <br /> contract documents which resulted in a change in the ranking of bidders. The revised <br /> ranking did not change the apparent low and responsive bidder, O'Grady Paving, Inc. <br /> Past work performed by O'Grady Paving, Inc. was verified to be satisfactory. Staff <br /> recommends award of the construction contract to the lowest responsive bidder, <br /> O'Grady Paving, Inc. <br /> Consultant/Specialty Services: <br /> Consulting testing services will be provided under the city's existing on-call materials <br /> testing contracts. The testing services are required to provide specialty testing of the <br /> materials and density checks in conformance with the City's Quality Assurance Program <br /> for paving. The testing is estimated to cost $30,000. <br /> Budget <br /> This project is an annual project funded as part of the FY 2021/22 CIP, with a <br /> programmed funding amount of$3.2 million. The total estimated project expenditure, <br /> including the contingency, is $3,852,155, leaving a project shortfall of$652,155. Staff <br /> recommends the transfer of $652,155 from various CIP projects, as outlined in the <br /> recommendations, to complete funding for this project. <br /> Funding for this project includes Gas Tax, SB-1, Measure B/BB, and Measure F funds — <br /> local and state transportation measures used to improve the condition of the local, <br /> county and state road systems. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans and Specifications and Award of Contract June 7, 2022 <br /> Start of Construction July 15, 2022 <br /> End of Construction October 30, 2022 <br /> Submitted by: Fiscal Review: Approved by: <br /> Stephen Kirkpatrick Mahin Shah G rry Beaudin <br /> Director of Engineering Interim Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Estimated Expenditure Summary <br /> 2. Project Location Map <br /> 3. Bid Summary <br /> Page 5 of 5 <br />