My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
051722
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2022 10:43:25 PM
Creation date
5/11/2022 11:05:40 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2022
EXPIRATION DATE
5/17/2037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />On February 15, 1966, a freeway maintenance agreement was executed between the <br />County of Alameda and the State for the development of the portion of the state <br />highway Interstate Route 580 (1-580) within the limits of the County of Alameda. In <br />1969, the City entered into a freeway maintenance agreement taking over the <br />maintenance responsibility from the County which covered Hopyard Road. In August <br />1986, the City entered into an agreement with Caltrans for the construction of a <br />northbound overcrossing structure at the Hopyard Road, Dougherty Road, and 1-580 <br />interchange. <br />On June 6, 1989, the City entered into an updated freeway maintenance agreement <br />with Caltrans for 1-580 within the city limits. <br />On September 6, 1994, the City entered into a cooperative agreement with Caltrans for <br />the installation of highway plantings and an automatic irrigation system at the Hopyard <br />Road and 1-580 interchange. <br />On February 23, 2010, the City entered into an agreement with Caltrans for landscape <br />maintenance within the state highway right of way on 1-580 for various locations, <br />including Hopyard Road. <br />DISCUSSION <br />The City is working with Caltrans to obtain an encroachment permit for the Hopyard <br />Road and Owens Drive Intersection Improvements Project, CIP No. 15525. The project <br />proposes to construct a southbound right -turn lane along Hopyard Road at the Owens <br />Drive intersection and to add a southbound bike lane to close the existing bike lane gap <br />from the eastbound 1-580 off -ramp intersection to the south of Owens Drive. The project <br />will include a new sound wall placed alongside the existing building'in the northwest <br />quadrant of the intersection as the roadway is within 13 feet of the closest building. The <br />proposed improvements within the State's right of way require the City to obtain an <br />encroachment permit from Caltrans. <br />As part of Caltrans' review and before issuance of an encroachment permit, Caltrans <br />has required an update to the Freeway Maintenance Agreement for Hopyard Road and <br />1-580 bridge overcrossing. This includes updated mapping of the areas of ownership <br />and documentation of responsibility. <br />The attached project -specific maintenance agreement consolidates the previous <br />agreements into one agreement and clarifies the responsibilities of both the State and <br />the City concerning the roadway, bike path, bridge overcrossing, landscaped area, and <br />sound wall maintenance for the Hopyard Road and 1-580 bridge overcrossing. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.