Laserfiche WebLink
53. IMPROVEMENT PLAN AND MAP REVIEW FEES: The applicant shall pay all applicable <br /> plan check review fees to the Engineering Department with the first submittal of the <br /> improvement plans, grading plans, and parcel) map. <br /> 54. SUBDIVISION FEES — PARCEL MAPS: The applicant shall pay all subdivision fees to <br /> the Engineering Department prior to Director of Engineering/City Engineer approval of the <br /> parcel map at the rate in effect at the time of the approval for the total number of <br /> buildable lots on the map. <br /> 55. IMPROVEMENT SECURITY — PARCEL MAPS: The applicant shall submit a <br /> performance bond and labor and material bond, or other improvement security <br /> acceptable to the Director of Engineering/City Engineer, for all private and public <br /> subdivision improvements necessary to serve the subdivision to the Engineering <br /> Department prior to Director of Engineering/City Engineer approval of the parcel map. <br /> Both bonds shall be in an amount equal to 100 percent of the cost estimate as approved <br /> by the Director of Engineering/City Engineer. The improvement security may be waived if <br /> the necessary improvements have been constructed to the satisfaction of the Director of <br /> Engineering/City Engineer prior to City Engineer approval of the parcel map. <br /> 56. WARRANTY BOND: The applicant shall submit a one-year warranty bond in an amount <br /> of 10 percent of the full value of all public subdivision improvements necessary to serve <br /> the subdivision to the Engineering Department prior to City Council acceptance of the <br /> public subdivision improvements. <br /> 57. RECORDATION: The applicant's title company shall perform the following: <br /> a. File the Certificate of Approval and Grant Deed(s) for record at the Alameda <br /> County Clerk-Recorder's Office. <br /> b. Upon recordation of the Grant Deed(s), the title company shall certify and note the <br /> recording data on the 18-inch X 26-inch mylar and return the original mylar to the <br /> Director of Engineering/City Engineer. <br /> FIRE DEPARTMENT — 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and <br /> fire hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation <br /> of the on-site fire mains and fire hydrants. Specific installation drawings submitted by the <br /> licensed underground fire protection contractor shall be submitted to the Fire Prevention Bureau <br /> for approval; and 2.) Backflow prevention or connections to the public water mains. <br /> 57.FIRE HAZARDS: The project developer shall keep the site free of fire hazards from the start <br /> of lumber construction until the final inspection. <br /> 58. FIRE CODE: All construction shall conform to the requirements of the 2016 Pleasanton <br /> Fire Code and local ordinances. All required permits shall be obtained prior to work <br /> commencement. <br /> PUD-140 &P21-0079 Planning Commission <br /> Page 10 of 15 <br />t full payment for the Acting City <br /> Surveyor's fee and the City's administrative fee and all applicable plan check fees with <br /> the first map plan check. Unspent Acting City Surveyor's fees will be refunded to the <br /> applicant following recordation of the map. If the applicant withdraws their application in <br /> writing prior to recordation of the map, unspent Acting City Surveyor's fees will be <br /> refunded to the applicant. If the Acting City Surveyor's estimate is insufficient to cover <br /> their services, the applicant shall pay the difference between the initial estimate and the <br /> actual cost prior to submittal of the map for the Director of Engineering/City Engineer's <br /> signature. <br /> PUD-140 & P21-0079 Planning Commission <br /> Page 9 of 15 <br />