My WebLink
|
Help
|
About
|
Sign Out
PC-2021-09
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2021
>
PC-2021-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:53:33 AM
Creation date
4/25/2022 10:53:08 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/14/2021
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2021-09
NOTES
P21-0079, PUD-140, TERRY TOWNSEND, MINOR SUBDIVISION, PLANNED UNIT DEVELOPMENT (PUD), 2207 MARTIN AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prevention Plan) Practitioner (QSP) for all projects disturbing 1 acre or more or by a <br /> California licensed civil engineer or California licensed landscape architect for all projects <br /> disturbing less than 1 acre of land, subject to the review and approval of the Director of <br /> Engineering/City Engineer. All cut and fill slopes shall be hydromulched/hydroseeded and <br /> stabilized immediately after the completion of grading work and in no case later than <br /> October 1, unless otherwise approved by the Director of Engineering/City Engineer. No <br /> grading shall occur between October 1 and April 30 unless erosion control measures are <br /> in place, subject to the review and approval of the Director of Engineering/City Engineer. <br /> Such measures shall be maintained until the permanent landscaping is completed to the <br /> satisfaction of the Director of Engineering/City Engineer and the Notice of Termination for <br /> the coverage under the Construction General Permit, if applicable, is approved by the <br /> California State Water Resources Board. <br /> 49. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall <br /> obtain an encroachment and haul route permit from the Engineering Department prior to <br /> moving equipment to the project site or performing work in the public right of way or <br /> within public easements. The applicant's contractor shall submit a completed and signed <br /> encroachment permit application accompanied with six copies of City-approved <br /> improvement plans, proof of insurance with endorsement adding the City as an additional <br /> insured, a copy of a valid City of Pleasanton business license, applicable fees, and other <br /> requirements determined by the Director of Engineering/City Engineer. <br /> 50. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall <br /> repair damage to existing public and private improvements on and near the project site <br /> and along the haul route at their full expense caused by construction activities as <br /> determined and to the satisfaction of the Director of Engineering/City Engineer and prior <br /> to the City Council acceptance of public improvements. <br /> 51. AS-BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit <br /> signed and stamped as-built drawings and AutoCAD files for the construction of the <br /> public improvements and stormwater treatment system subject to the review and <br /> approval of the Director of Engineering/City Engineer and prior to the release of the <br /> performance and labor and materials bond. <br /> 52. ACTING CITY SURVEYOR MAP REVIEW: The applicant shall submit a preliminary copy <br /> of the parcel map, approved tentative map, preliminary title report(s), adjoining deeds, <br /> and underlying recorded maps to the Director of Engineering/City Engineer, prior to <br /> submittal of the first plan check. The Acting City Surveyor will provide a cost estimate to <br /> review the map and certify it is technically correct in compliance with the California <br /> Subdivision Map Act. The applicant shall submit full payment for the Acting City <br /> Surveyor's fee and the City's administrative fee and all applicable plan check fees with <br /> the first map plan check. Unspent Acting City Surveyor's fees will be refunded to the <br /> applicant following recordation of the map. If the applicant withdraws their application in <br /> writing prior to recordation of the map, unspent Acting City Surveyor's fees will be <br /> refunded to the applicant. If the Acting City Surveyor's estimate is insufficient to cover <br /> their services, the applicant shall pay the difference between the initial estimate and the <br /> actual cost prior to submittal of the map for the Director of Engineering/City Engineer's <br /> signature. <br /> PUD-140 & P21-0079 Planning Commission <br /> Page 9 of 15 <br />