Laserfiche WebLink
The project site is adjacent to the maintenance <br />corp yard. As a result, a 12 -foot wide maintenance <br />path that is separate from the current path was <br />added to allow for direct maintenance truck <br />circulation between the parking lot and the corp <br />yard. As the design continues to take form and <br />become more specific, the design team will work <br />closely with the operation maintenance team to <br />develop best practices for the Pleasanton All - <br />Abilities Playground. <br />It is recommended that the City calculate the <br />additional staff hours and maintenance equipment <br />required to properly maintain the All -Abilities <br />Playground and include the need for additional <br />staff hours and material costs into their operating <br />budget. <br />4.4 Conclusion <br />Text to come following remaining commission and <br />council meetings. <br />54 PLEASANTON ALL -ABILITIES PLAYGROUND <br />