Laserfiche WebLink
work hours, there was never a time observed in <br />which the park was empty. There was a consistent <br />stream of walkers, joggers, cyclists, dog walkers, <br />ball players, and children playing. Activity increased <br />during the weekday evenings, and many of the <br />soccer fields were utilized for youth sports <br />practice. <br />On weekends, especially tournament weekends, <br />the park was packed with teams, spectators, and <br />other park users, significantly impacting parking <br />facilities. Although the park was very busy during <br />Existing parking lot. <br />One of the existing lawns on site. <br />these times, it did not feel overcrowded. There was <br />plenty of seating, shade, walking, and recreational <br />space available. <br />The physical and behavioral aspects of the site <br />helped inform the suitability and siting of uses <br />desired by the community. <br />Existing path between the youth baseball <br />field and maintenance corp yard. <br />Existing path leading to the parking lot. <br />MASTER PLAN 19 <br />