Laserfiche WebLink
ATTACHMENT 3 <br /> Pleasanton Skatepark <br /> Opinion of Probable Cost- Conceptual Design Level 14-Dec-21 <br /> Location:Ken Mercer Sports Park,Pleasanton <br /> Client:City of Pleasanton <br /> Project Area: 160,000 SF <br /> NO. BID ITEM&DESCRIPTION QTY UNIT UNIT COST TOTAL COST <br /> General Requirements <br /> 1 Erosion Control/SWPPP 1 LS 45,000.00 $45,000.00 <br /> Subtotal: $45,000 <br /> Demolition <br /> 2 Demo park areas including skatepark,curbs, 1 LS 400,000.00 $400,000 <br /> concrete path,furnishings,trees,etc. <br /> Subtotal: $400,000 <br /> Earthwork <br /> 3 General earthwork-excavation,grading,export. 1 LS 200,000.00 $200,000 <br /> Stockpile&reuse. <br /> Subtotal: $200,000 <br /> Utilities <br /> 4 Drainage,stormwater,bioretention 1 LS 300,000.00 $300,000.00 <br /> 5 Water line to drinking fountains&sewer connection: 1 LS 25,000.00 $25,000.00 <br /> 6 Electrical 1 LS 70,000.00 $70,000.00 <br /> Subtotal: $395,000 <br /> Skate Park&Features <br /> 7 Excavation&rough grading&export 1 LS 325,000.00 $325,000.00 <br /> 8 Finegrade&subbase 1 LS 250,000.00 $250,000.00 <br /> 9 Outside drain system&storm drain connect 1 LS 160,000.00 $160,000.00 <br /> 10 Place and finish upper&lower deck 1 LS 260,000.00 $260,000.00 <br /> 11 Place and fnish ramps&bowls 1 LS 455,000.00 $455,000.00 <br /> 12 Form&pour CIP walls&curbs 1 LS 275,000.00 $275,000.00 <br /> 13 Setup transitions&deck 1 LS 375,000.00 $375,000.00 <br /> 14 Coping&rails 1 LF 315,000.00 $315,000.00 <br /> 15 Rebar 1 LS 160,000.00 $160,000.00 <br /> 16 Sample transition 1 LS 12,000.00 $12,000.00 <br /> Subtotal: 2,587,000 <br /> Exterior Improvements <br /> PAVING AND RAILINGS <br /> 17 Concrete Paving-Pedestrian 8600 SF 20.00 $172,000.00 <br /> 18 Concrete Paving-Vehicular 10650 SF 24.00 $255,600.00 <br /> 19 Concrete Curb-Parking lot&entry 700 LF 40.00 $28,000.00 <br /> 20 Concrete Curb-Mow curb/edge 360 LF 30.00 $10,800.00 <br /> 21 Decomposed granite-stabilized/permeable 6600 SF 10.00 $66,000.00 <br /> 22 Concrete steps&handrails-East Entry 1 LS 50,000.00 $50,000.00 <br /> 23 Concrete seat wall at west main shelter 90 LF 220.00 $19,800.00 <br /> 24 Concrete stepped seat wall at small shelter 1 LS 16,000.00 $16,000.00 <br /> 25 Concrete wall-retaining 100 LF 250.00 $25,000.00 <br /> 26 Concrete wall-raised planter/seat wall 90 LF 200.00 $18,000.00 <br /> 27 Guard Rail-Edge of Skate Features 440 LF 150.00 $66,000.00 <br /> 28 Additional Aspalt Parking 14000 SF 6.00 $84,000.00 <br /> 29 Parking striping&ADA symbols 1 LS 6,000.00 $6,000.00 <br /> 30 Fence-low metal barrier fence 70 LF 190.00 $13,300.00 <br /> Subtotal: $830,500 <br />