My WebLink
|
Help
|
About
|
Sign Out
ORD 2234
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:55 PM
Creation date
3/8/2022 4:25:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/1/2022
DESTRUCT DATE
PERMANENT
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
82. RIGHT OF ENTRY: The applicant shall furnish written proof of all necessary rights -of - <br />entry, permits and/or easements for the construction of off-site temporary or permanent <br />improvements to the Director of Engineering/City Engineer prior to the issuance of <br />permits. (Address this condition prior to final map approval) <br />83. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant <br />shall repair damage to existing public and private improvements on and near the project <br />site and along the haul route at their full expense caused by construction activities as <br />determined and to the satisfaction of the Director of Engineering/City Engineer and prior <br />to the City Council acceptance of public improvements. (Address this condition prior to <br />tract acceptance) <br />84. AS -BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit <br />signed and stamped as -built drawings and AutoCAD files for the construction of the <br />public improvements and stormwater treatment system subject to the review and <br />approval of the Director of Engineering/City Engineer and prior to the release of the <br />performance and labor and materials bond. (Address this condition prior to tract <br />acceptance) <br />85. MAINTENANCE OF COMMON IMPROVEMENTS: All common improvements including <br />but not limited to storm drainage swales, gutters, inlets, outfalls, channels, retaining <br />walls, soundwalls, fences, etc., shall be privately maintained by the property owners <br />through a Homeowners Association. (Address this condition prior to final map approval) <br />86. SUBDIVISION AGREEMENT: The applicant shall enter into a subdivision agreement <br />with the City agreeing to construct and complete all improvements necessary to serve <br />the subdivision. The agreement shall be executed and submitted to the City prior to <br />approval of the final map. As part of the agreement, the applicant shall provide <br />securities acceptable to the City, guaranteeing construction of the required <br />improvements. <br />87. ACTING CITY SURVEYOR MAP REVIEW: The applicant shall submit a preliminary <br />copy of the final map, approved tentative map, preliminary title report(s), adjoining <br />deeds, and underlying recorded maps to the Director of Engineering/City Engineer, <br />prior to submittal of the first plan check. The Acting City Surveyor will provide a cost <br />estimate to review the map and certify it is technically correct in compliance with the <br />California Subdivision Map Act. The applicant shall submit full payment for the Acting <br />City Surveyor's fee and the City's administrative fee and all applicable plan check fees <br />with the first map plan check. Unspent Acting City Surveyor's fees will be refunded to <br />the applicant following recordation of the map. If the applicant withdraws their <br />application in writing prior to recordation of the map, unspent Acting City Surveyor's <br />fees will be refunded to the applicant. If the Acting City Surveyor's estimate is <br />insufficient to cover their services, the applicant shall pay the difference between the <br />initial estimate and the actual cost prior to submittal of the map for the Director of <br />Engineering/City Engineer's signature. <br />88. SUBDIVISION FEES: The applicant shall pay all subdivision fees to the Engineering <br />Department prior to Director of Engineering/City Engineer approval of the final map at <br />the rate in effect at the time of the approval for the total number of buildable lots on the <br />map. <br />PUD -138 and VTM 8616 Page 19 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.