My WebLink
|
Help
|
About
|
Sign Out
RES 221271
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2022
>
RES 221271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 2:56:45 PM
Creation date
3/1/2022 2:32:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GHG Reduction Strategies Quantification and Evidence <br />Page 6 <br />Summary At‐a‐Glance <br />Co‐Benefits Key <br /> <br />Resilience <br /> <br />Public health <br /> <br />Ecosystem and habitat health <br /> <br />Equity <br /> <br />Job creation <br /> <br />Mobility & transport safety <br /> <br />Acronym/Abbreviation Key <br />Comm. Community <br />NPV Net present value Net current value of all current and future cash flows <br />associated with the project; considers both costs and <br />cost savings (i.e., benefits). Negative values are a net <br />cost savings. <br />GHG Greenhouse gas Methane, carbon dioxide, and nitrous oxides that <br />contribute to climate change <br />MTCO2e Metric tons carbon dioxide equivalent Common unit for quantifying GHG emissions <br /> <br />Denotes actions with notable direct or indirect GHG savings that were not quantified due to <br />measurement constraints. <br /> <br /> NPV Costs ($) <br />GHG <br />savings <br />(MTCO2e) <br />Cost Effectiveness <br />($/MTCO2e) Co‐benefits <br />Sector ID Action <br />NPV Costs to <br />City <br />NPV Costs to <br />Community <br />Cumulative <br />Savings ‐ to <br />2030 City <br />Comm‐ <br />unity <br />BE P1 All‐electric reach <br />code $49,020 ($2,784,572) <br /> <br />10,136 $5 ($275) <br /> <br />BE P2 Existing Building <br />Electrification Plan $138,455 $137,032 <br /> <br />16,511 $8 $8 <br /> <br />BE S1 Refrigerant <br />management in new <br />construction $42,675 ($262,307) <br />N/A N/A <br />BE P3 Modify Municipal <br />Code definition of <br />covered projects $0 $287,074 <br /> <br />1,290 $0 $223 <br />BE S2 Community energy <br />efficiency upgrades $958,041 ($1,959,201) <br /> <br />7,450 $129 ($263) <br /> <br />BE S3 Energy Benchmarking <br />and City Facility <br />Retrofits ($3,103,111) $0 <br /> <br />351 ($8,833) $0 <br />BE E2 Zero emissions <br />energy as default <br />EBCE choice N/A N/A <br /> <br />255,712 N/A N/A <br />BE P4 Solar and storage on <br />new construction $0 $0 <br /> <br />2,341 $0 $0 <br /> <br />TLU P5 ZEV Infrastructure <br />Plan $217,582 ($31,005) <br /> <br />118,182 $2 $0 <br /> <br />TLU P6 Small‐engine and off‐ <br />road <br />equipment electrifica <br />tion ‐ municipal $0 $0 <br />N/A N/A <br /> <br />TLU P7 Small‐engine <br />electrification ‐ <br />community $0 ($2,448,960) <br /> <br />6,250 $0 ($392) <br />TLU E3 Bicycle, pedestrian, <br />and trails network <br />expansion N/A N/A 6,409 N/A N/A
The URL can be used to link to this page
Your browser does not support the video tag.