Laserfiche WebLink
GHG Reduction Strategies Quantification and Evidence  <br />Page 6   <br />Summary At‐a‐Glance  <br />Co‐Benefits Key  <br />  <br />Resilience  <br />  <br />Public health  <br />  <br />Ecosystem and habitat health  <br />  <br />Equity  <br />  <br />Job creation  <br />  <br />Mobility & transport safety  <br />  <br />Acronym/Abbreviation Key  <br />Comm. Community  <br />NPV Net present value Net current value of all current and future cash flows  <br />associated with the project; considers both costs and  <br />cost savings (i.e., benefits). Negative values are a net  <br />cost savings.  <br />GHG Greenhouse gas Methane, carbon dioxide, and nitrous oxides that  <br />contribute to climate change  <br />MTCO2e Metric tons carbon dioxide equivalent Common unit for quantifying GHG emissions  <br />  <br />Denotes actions with notable direct or indirect GHG savings that were not quantified due to  <br />measurement constraints.  <br />  <br /> NPV Costs ($)  <br />GHG  <br />savings  <br />(MTCO2e)  <br />Cost Effectiveness  <br />($/MTCO2e) Co‐benefits  <br />Sector ID Action  <br />NPV Costs to  <br />City  <br />NPV Costs to  <br />Community  <br />Cumulative  <br />Savings ‐ to  <br />2030 City  <br />Comm‐ <br />unity   <br />BE P1 All‐electric reach  <br />code $49,020 ($2,784,572)  <br />                           <br />10,136  $5  ($275)  <br />  <br />BE P2 Existing Building  <br />Electrification Plan $138,455 $137,032  <br />                           <br />16,511  $8  $8  <br />  <br />BE S1 Refrigerant  <br />management in new  <br />construction $42,675 ($262,307)      <br />N/A N/A   <br />BE P3 Modify Municipal  <br />Code definition of  <br />covered projects $0 $287,074  <br />                           <br />1,290  $0  $223   <br />BE S2 Community energy  <br />efficiency upgrades $958,041 ($1,959,201)  <br />                           <br />7,450  $129  ($263)  <br />  <br />BE S3 Energy Benchmarking  <br />and City Facility  <br />Retrofits ($3,103,111) $0  <br />                           <br />351  ($8,833) $0   <br />BE E2 Zero emissions  <br />energy as default  <br />EBCE choice  N/A N/A  <br />                           <br />255,712  N/A N/A   <br />BE P4 Solar and storage on  <br />new construction $0 $0  <br />                           <br />2,341  $0  $0  <br />  <br />TLU P5 ZEV Infrastructure  <br />Plan $217,582 ($31,005)  <br />                           <br />118,182  $2  $0  <br />  <br />TLU P6 Small‐engine and off‐ <br />road  <br />equipment electrifica <br />tion ‐ municipal $0 $0      <br />N/A N/A  <br />  <br />TLU P7 Small‐engine  <br />electrification ‐  <br />community $0 ($2,448,960)  <br />                           <br />6,250  $0  ($392)   <br />TLU E3 Bicycle, pedestrian,  <br />and trails network  <br />expansion  N/A N/A 6,409 N/A N/A