My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Project Description <br /> <br /> <br />FirstCarbon Solutions 39 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />2.3.8 - Land Use Approvals <br />The proposed project requires approval of a PUD Plan. The PUD would conform to the HVSP, and <br />would also reflect conformance with Measures PP and QQ, and with Measure FF’s description of the <br />UGB. <br />The proposed project would also require the approval of tentative and final subdivision maps in <br />compliance with the Subdivision Map Act, including grading and improvement plans. <br />2.4 - Construction Schedule <br />Construction is assumed to begin with site preparation in 2022, and would continue for an estimated <br />2 years. Because each house would be owner-constructed, the ultimate buildout date is not known, <br />but is estimated to be within the 2 years for analysis purposes. <br />2.4.1 - Discretionary Actions <br />• Planned Unit Development Rezoning and Development Plan <br />• Vesting Tentative and Final Subdivision Map and Improvement Plans <br />• Growth Management Agreement for 22 Growth Management Unit Allocations <br />• Affordable Housing Agreement (The proposed development does not include an affordable <br />inclusionary housing component; the applicant instead is proposing to include ADUs and pay <br />the Affordable Housing Fee) <br /> <br />2.4.2 - Ministerial Actions <br />Subsequent ministerial actions would be required, including, without limitation, issuance of grading <br />permits, building permits, and certificates of occupancy.
The URL can be used to link to this page
Your browser does not support the video tag.