My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1-5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 1-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:13 AM
Creation date
2/10/2022 10:22:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix A - E
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PUD-138 and VTM 8616 Planning Commission <br />Page 9 of 30 <br />permit plans submitted to the Building and Safety Division for each home. Each <br />proposed point identified shall have a notation indicating the sheet(s) the point <br />can be found. A special inspection by the Planning Division shall be coordinated <br />with regards to exterior materials. Prior to building permit final of a home, all of <br />the green building measures indicated on the approved checklist shall be <br />inspected and approved by either the City of Pleasanton, a third party rater, or <br />the applicant shall provide written verification by the project engineer, architect, <br />landscape architect, or designer. (Per PMC 17.50) <br /> <br />Construction Practices and Noticing <br /> <br />31. WORK HOURS: All demolition and construction activities, inspections, plan <br />checking, material delivery, staff assignment or coordination, etc., shall be <br />limited to the hours of 8 a.m. to 5 p.m., Monday through Friday. No construction <br />shall be allowed on State or Federal Holidays, Saturdays or Sundays. The <br />Director of Community Development may allow earlier “start times” or later “stop <br />times” for specific construction activities, e.g., concrete pouring. All construction <br />equipment shall meet Department of Motor Vehicles (DMV) noise standards and <br />shall be equipped with muffling devices. Prior to construction, the hours of <br />construction shall be posted on site. <br /> <br />32. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other <br />similar vehicle are not allowed on the construction site except when needed as <br />sleeping quarters for a security guard subject to receipt of a temporary <br />conditional use permit (per PMC 18.116.010.E). <br /> <br />33. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be <br />placed on the project site for daily administration/coordination purposes during <br />the construction period. <br /> <br />34. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall <br />prepare a construction and parking management plan to address impacts and <br />parking demands during the construction phase of the project. The construction <br />and parking management plan shall be subject to review and approval by the <br />City Traffic Engineer and Director of Community Development prior to issuance <br />of a demolition permit, or the first building permit, whichever comes first. The <br />following items shall be incorporated into the construction and parking <br />management plan: <br /> <br />a. Show truck route for construction and delivery trucks that does not <br />include neighborhood residential streets, unless approved by the City <br />Traffic Engineer; <br />b. Show construction vehicles and equipment parking area, materials <br />storage, temporary fencing, construction trailer location, and construction <br />contractors/workers parking area.
The URL can be used to link to this page
Your browser does not support the video tag.