My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1-5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 1-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:13 AM
Creation date
2/10/2022 10:22:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix A - E
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PUD-138 and VTM 8616 Planning Commission <br />Page 7 of 30 <br /> <br />18. ALISAL STREET SHOULDER AND DRAINAGE IMPROVEMENTS FOR <br />PEDESTRIAN USE: Improvements along the east side of Alisal Street shall <br />consist of shoulder and drainage improvements sufficient to provide a 3 to 6- <br />foot-wide natural trail where possible. Said improvements shall avoid removing <br />above-ground utilities, and existing landscaping extended from residential <br />properties into the existing right-of-way, where possible. The improvements shall <br />start at the northern boundary of the project site traveling north until it meets <br />Sycamore Road. The improvements shall be constructed by the applicant in <br />conjunction with the Project subdivision improvements, but if delayed for any <br />reason outside the control of the Applicant said delay shall not result in a delay <br />to the Project. For example, should any property or easement acquisition be <br />necessary to construct the improvements, then said acquisition shall be the sole <br />responsibility of the City and shall not delay the Project subdivision <br />improvements. The applicant shall receive credits for the approved costs to <br />design and construct the improvements per City standards and subject to Cal. <br />Labor Code §1720 et. seq., against the Capital Facilities Fee and Transportation <br />Development Fee otherwise due, up to the total amount of such fees at the time <br />of their required payment, through a fee credit agreement as provided in PMC <br />§§3.22.060 and 3.26.070. If design and construction costs of the improvements <br />exceed the fee credits, the applicant shall be responsible for such costs not to <br />exceed the fee credits plus 11% of the credits; and applicant shall be repaid for <br />approved costs that exceed 11% of the credits by a reimbursement agreement <br />as provided in PMC §19.40.060. (PROJECT SPECIFIC CONDITION) <br /> <br />19. PARKING: A minimum of three parking spaces shall be provided for the primary <br />residence. A minimum of four on site visitor parking spaces shall be provided <br />with ample on site turn around space eliminating the need for vehicles to back <br />out onto the public right of way.(PROJECT SPECIFIC CONDITION) <br /> <br />20. PARKING FOR ADU: One parking space shall be provided for the ADU. <br />(PROJECT SPECIFIC CONDITION) <br /> <br />21. FIREPLACES: All new indoor and outdoor fireplaces or similar appliances shall <br />be an electrical fireplace. (PROJECT SPECIFIC CONDITION) <br /> <br />22. OPEN SPACE MANAGEMENT PLAN: A site-specific Open Space Management <br />Plan shall be submitted and is subject to review and approval by the City <br />Attorney’s Office and Fire Marshal prior to recordation of the final map. The plan <br />shall address agricultural operations, open space maintenance, and wildlife and <br />vegetation preservation needs. The plan shall also include a Wildland Fire <br />Protection Plan component. (PROJECT SPECIFIC CONDITION) <br /> <br />23. CONDITIONS OF APPROVAL: The applicant shall provide all initial buyers with <br />copies of the final project conditions of approval. (PROJECT SPECIFIC
The URL can be used to link to this page
Your browser does not support the video tag.