My WebLink
|
Help
|
About
|
Sign Out
2 ATTACHMENT 5-7
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
020822
>
2 ATTACHMENT 5-7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:43:55 PM
Creation date
2/2/2022 4:14:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/1/2022
DESTRUCT DATE
15Y
Document Relationships
2
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\020822
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/Z; <br />STEELWAVE <br />of the Parcels would enhance the existing community. See Exhibit A. <br />Recommended Score: 1 <br />1d) Site is not anticipated to require offsite sewer, water or dry utilities infrastructure improvements. <br />According to the 2015 East Pleasanton Specific Plan Draft Environmental Impact Report prepared by the <br />City, development of the USL parcels is not anticipated to require extensive offsite utility improvements. If <br />the USL Parcels were annexed into the City, only minor offsite linear utilities (i.e., pipelines) would be <br />required to connect the Parcels to existing infrastructure. <br />Recommended Score: 1 <br />1e) Site is adjacent to Recycled Water infrastructure. According to the 2015 East Pleasanton Specific Plan <br />Draft Environmental Impact Report prepared by the City, the USL Property development would include a <br />recycled water loop connection to the existing City services to the north. See Exhibit C. <br />Recommended Score: 1 <br />2c) Site is within 1/3 mile of transit stop with 15 minute headway to a BART station. Wheels Route 10 <br />operates on Stanley Blvd and Santa Rita Road with frequency at 13 minute as referenced in the East <br />Pleasanton Specific Plan with less than 15 minute headway. See Exhibit C. <br />Recommended Score: 1 <br />2d) Site is within 1/3 mile of a transit stop with 30 minute headway. Wheels Route 10 operates on Stanley <br />Blvd and Santa Rita Road with frequency at 13 minute as referenced in the East Pleasanton Specific Plan <br />with less than 30 minute headway. See Exhibit C. <br />Recommended Score: 1 <br />2e) Site is adjacent to an existing bike facility. The USL Parcels are less than 500 yards from the intersection <br />of Busch Road and Ironwood Avenue, where an existing bike lane runs along Busch Road and connects to <br />the Iron Horse Trail near the intersection of Busch Road and Valley Avenue. Additionally, it is contemplated <br />that development of the USL Parcels would include extension of the Iron Horse Trail through the Property. <br />See Exhibit C. <br />Recommended Score: 1 <br />2f) Site is within 1 mile of freeway on-ramp. The USL Property, referenced as Parcel H, is within 1 mile of <br />the 1-580 on-ramp. See Exhibit A. <br />Recommended Score: 1 <br />3b) Site is within % mile of an existing elementary school. As described in the City's 2015 East Pleasanton <br />Specific Plan Draft Environmental Impact Report, the USL Parcels include a proposed 10 -acre school site <br />should the City and community wish to build a new school to serve the proposed residential development. <br />Additionally, Mohr Elementary is within .5 miles of the USL Property, referenced as Parcel H. See Exhibit C. <br />Recommended Score: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.