My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
011822
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 9:52:15 AM
Creation date
1/13/2022 9:52:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/18/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A- SCOPE OF SERVICES <br /> Task 5—Supplemental Modeling Investigations and Other Studies <br /> Under this task, the City will identify additional studies and investigations that will make use of the hydraulic <br /> model developed for this project. Up to ten (10) such studies are included in this scope of services, which <br /> may include the following: <br /> • Long-term convenance and pumping configurations associated with the East Amador Lift Station <br /> and Trunk and Relief Sewers, including which planning scenarios would drive the need for <br /> improvements to these facilities <br /> • Sewer conveyance planning for future development associated with the East Pleasanton Specific <br /> Plan <br /> • Sewer conveyance planning for re-directing Ruby Hill flows to DSRSD <br /> Woodard & Curran will work with City engineering, operations, and planning staff to identify the specific <br /> issues and questions that need to be addressed in each study and develop an appropriate approach to the <br /> investigations using the data, criteria, and modeling tools developed in previous tasks. It is anticipated that <br /> the level of effort for these studies may vary depending on the complexity of the issues involved. For <br /> purposes of estimating the budget for this task, an average level of effort of 24 hours per study is assumed. <br /> Task 5 Deliverables: <br /> • Draft and final TMs for each supplemental investigation/study, including data, assumptions, <br /> modeling and analysis results, and recommendations <br /> Task 6—Capacity Evaluation Report <br /> This task involves compiling the work summarized in previous TMs into an overall Capacity Evaluation <br /> Report. As an optional task, Woodard &Curran will also develop and deliver a web-based model viewer <br /> program for use by City staff after completion of this project. <br /> Subtask 6.1 —Capacity Evaluation Report. Woodard & Curran will compile the TMs prepared for this <br /> study into a Capacity Evaluation report. The report appendices will contain supporting data including flow <br /> monitoring data plots; parcel land use and flow summary tables; model calibration graphs; model data and <br /> results tables; improvement project descriptions, maps, and cost estimates; and other pertinent information. <br /> The report will also include an Executive Summary section that can be extracted as a stand-alone <br /> document and provided to City Council members or other interested parties. <br /> Subtask 6.2—Model Viewer(Optional). Woodard &Curran will provide a web-based model viewer for use <br /> by City staff in viewing hydraulic model results for existing and future growth scenarios. The viewer will <br /> allow viewing of all modeled infrastructure on a suitable GIS base map along with attribute data, model <br /> flows for various scenarios, and recommended improvement projects. The viewer will be developed using <br /> ArcGIS Online. Woodard &Curran will assist the City in installing the viewer. As an option, Woodard & <br /> Curran will "host"the viewer on its own web server. <br /> Task 6 Deliverables: <br /> • Draft and final Capacity Evaluation report <br /> • Model viewer(optional) <br /> Woodard &Curran -7- 12/20/21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.