My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
122121
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 4:16:53 PM
Creation date
12/15/2021 4:14:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist <br />Transportation <br /> <br />Draft Initial Study – Negative Declaration 77 <br />17 Transportation <br /> <br />Potentially <br />Significant <br />Impact <br />Less than <br />Significant <br />with <br />Mitigation <br />Incorporated <br />Less than <br />Significant <br />Impact <br />No <br />Impact <br />Would the project: <br />a. Conflict with a program, plan, ordinance or <br />policy addressing the circulation system, <br />including transit, roadway, bicycle and <br />pedestrian facilities? □ □ □ ■ <br />b. Conflict or be inconsistent with CEQA <br />Guidelines section 15064.3, subdivision <br />(b)? □ □ □ ■ <br />c. Substantially increase hazards due to a <br />geometric design feature (e.g., sharp <br />curves or dangerous intersections) or <br />incompatible use (e.g., farm equipment)? □ □ ■ □ <br />d. Result in inadequate emergency access? □ □ ■ □ <br />a. Would the project conflict with a program, plan, ordinance or policy addressing the circulation <br />system, including transit, roadway, bicycle and pedestrian facilities? <br />b. Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, <br />subdivision (b)? <br />The Pleasanton General Plan Circulation Element includes the following goals: <br />▪ Goal 1: Develop a safe, convenient, and uncongested circulation system. <br />▪ Goal 2: Develop and manage a local and regional street and highway system which <br />accommodates future growth while maintaining acceptable levels of service. <br />▪ Goal 3: Protect residential neighborhood quality-of-life and community character from cut- <br />through traffic, speeding, and nonresidential parking. <br />▪ Goal 4: Provide a multi-modal transportation system which creates alternatives to the single- <br />occupancy automobile.87 <br />Additionally, the City adopted the Pleasanton Bicycle and Pedestrian Master Plan in 2018 to make <br />active transportation a safe and pleasant option within Pleasanton by providing a dedicated bicycle <br />and pedestrian network. The Pleasanton Bicycle and Pedestrian Master Plan also implements the <br />Pleasanton General Plan goals, policies, and programs related to complete streets by building on the <br />blueprint for a system of bikeways established in the Pleasanton General Plan.88 <br /> <br />87 Pleasanton, City of. 2009. General Plan Circulation Element. Available: <br /><https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23898>. Accessed October 18, 2021. <br />88 Pleasanton, City of. 2018. Bicycle and Pedestrian Master Plan. Available: <br /><http://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=32630>. Accessed October 18, 2021.
The URL can be used to link to this page
Your browser does not support the video tag.