Page 5 of 6 <br />order to attempt to locate all above ground utility structures, (e.g. valve boxes, <br />vaults, manholes, inlets, lights, traffic poles, misc. boxes, drain inlets, exposed <br />conduits and pipes, overhead wires, etc.) which are associated with above and <br />below ground utilities. The survey will be limited to those structures and features <br />which are within the public ROW (or easement) and which are readily visible. <br />Survey work will include opening and “dipping” sewer and storm drain structures in <br />order to obtain invert elevations, and approximate pipe sizes and general directions <br />will be noted. See below for more detailed explanation and traffic control for <br />“dipping” work. Although we cannot request USA to mark underground utilities, we <br />assume that some areas will have utility markings from past or adjacent projects, <br />which we will include in our ground survey. <br /> <br />Survey work will include opening and “dipping” sewer and storm drain structures in <br />order to obtain invert elevations, and approximate pipe sizes and general directions <br />will be noted. <br /> <br />Cross sections shall be taken in 50-ft increments along curb (or shorter increments <br />as appropriate per the existing terrain/alignment). Cross section data will be <br />collected from back-of-walk to back-of-walk and will only capture roadway surface <br />features. The survey will not include any points behind the sidewalk EXCEPT for <br />any utilities behind the walk but still in the public right-of-way, as described above. <br /> <br />In addition to the utilities and cross section surveys described above, LCC will <br />perform additional supplemental survey and mapping services which will also <br />include surveying above ground structures, buildings, fences, trees (larger than 6”), <br />walls, sidewalks, curbs, edge of travelled ways or pavement areas, geotechnical <br />boreholes (if present), grade breaks, top and toe of slopes, contours and spot <br />elevations which are sufficient for design purposes, as determined by the client and <br />agreed upon by LCC. <br /> <br />The data collected during the ground surveys will be incorporated into the aerial <br />planimetric mapping. <br /> <br />DELIVERABLES, ASSUMPTIONS, AND EXCLUSIONS <br />Mapping to be presented in hard copy but is also available digitally in AutoCAD <br />2013 format. Files may be saved in previous release versions, if available, upon <br />request. <br /> <br />OPTIONAL TASK IS <br />NOT INCLUDED IN <br />FEE