Laserfiche WebLink
Pleasanton PFAS Treatment & Wells Rehabilitation Project <br />City of Pleasanton <br />JDH Corrosion Consultants, Inc. 3 <br />the plans and profiles for the new water pipelines prepared by Carollo for construction details and <br />proposed pipeline materials and determine the suitability of the proposed materials based on the collected <br />field and laboratory data. <br /> <br /> <br />Task 3 – Final Design & Bid Documents <br /> <br />1. Prepare detailed design drawings, assuming a 30-year minimum design life. Prepare detailed installation <br />drawings for corrosion control for selected project alternative (pipe and well sites) including appropriate <br />stray current corrosion control, if needed. Review the proposed pipeline alignment for potential stray <br />current problems. Determine if the pipeline will parallel and cross any gas or other water pipelines as <br />each of these areas represent potential stray current problems. <br /> <br />Design drawings will be prepared in accordance with the project standards for 50%, 95%, and 100% <br />submittals. Design details will be prepared in AutoCAD Release 2018 format and electronically <br />transmitted to Carollo for inclusion into the project plans. <br /> <br />2. Prepare technical design specifications, assuming a 30-year minimum design life. <br /> <br />Technical design specifications will be prepared in accordance with the project standards for 50%, 95%, <br />and 100% submittals. Specifications will be prepared in Word format and e-mailed to Carollo for inclusion <br />into the project design documents. <br /> <br />3. Prepare detailed engineering cost estimate for supply of materials and installation of the proposed stray <br />current and cathodic protection systems. Engineering cost estimate will be prepared for 50%, 95% and <br />100% submittals. <br />