My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
111621
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 3:04:34 PM
Creation date
11/10/2021 3:04:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/16/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction project experience requirements nor were they members of the PTBA as <br />required for the project. <br />Staff recommends that the US Engineering, Inc., Kerex Engineering, and the Brannon <br />Corporation bids be deemed non-responsive and that Council award the bid for the <br />Meadowlark Trail Project, CIP No. 22797, to the lowest responsive bidder, American <br />Ramp Company, in the amount of $59,500. American Ramp Company has experience <br />installing natural surface trails in the Bay Area and is an active member of the <br />Professional Trailbuilder's Association. <br />All bid documents were found to be in order and references for the contractor were <br />verified. <br />After the development approval, staff modified the plans to specify approximately 150 <br />linear feet of five -foot -wide decomposed granite path along Foothill Road instead of the <br />proposed dirt trail. Although the decomposed granite path requires additional funding for <br />the project, it is a more resilient and low -maintenance solution for the portion of the trail <br />adjacent to the road. <br />Schedule <br />The proposed schedule for this project is as follows: <br />Approval of Plans and Specifications and Award of Contract <br />Estimated Start of Construction <br />Estimated End of Construction <br />Submitted by: <br />Stephen ick <br />Director of Engineering <br />Reviewed by: <br />XI/4- <br />Tina Olson <br />Director of Finance <br />Attachments: <br />1. Estimated Funding and Expenditure Summary <br />2. Bid Summary <br />Page 3of3 <br />November 16, 2021 <br />December 2021 <br />January 2022 <br />Approved y: <br />Nelson Fialho <br />City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.