Laserfiche WebLink
ATTACHMENT 3 <br />Attachment 3- Proposed Goals, Strategies, and Actions <br />August 12, 2021 <br />Buildings & Energy <br />Goal <br />Reduce greenhouse gas emissions from buildings and associated energy consumption and increase buildings and energy resilience which will <br />result in cost savings, improved public health, and improved infrastructure. <br />Existing Ongoing Actions <br />Maintain highest EBCE choice for Maintain the highest renewable energy choice as the default for all municipal facilities, including opportunities to secure Power <br />municipal operations Purchase Agreements with other EBCE jurisdictions. <br />Maintain zero emissions energy as Maintain the default EBCE electricity service to ensure the community is receiving zero -emission energy, if economically feasible. <br />default East Bay Community Energy <br />(EBCE) choice <br />Strategy 1: Advance the decarbonization of buildings. <br />1001, All -electric reach code Adopt an all -electric building reach code for new construction that limits the development of new gas infrastructure where <br />! economically feasible. Ensure solutions are equitably tailored to different building, ownership, and use types. This will require a j <br />cost effectiveness evaluation and further outreach. Exceptions to the Code can be considered. <br />1164 Existing Building Develop and implement an Existing Building Electrification Plan to advance electrification of buildings. As a part of this effort: <br />Electrification Plan Grid Analysis/Improvements <br />• Work with EBCE, PG&E, and regional partners to ensure we have a robust regional electrical grid that minimizes the risk <br />of power outages, increases storage, and reduces demand for diesel or gas generators. Consider opportunities for local <br />renewable generation. <br />• Conduct an existing building electrification analysis to identify areas of opportunities, building types, and prerequisites <br />needed to make electrification cost-effective in the community. <br />Municipal Buildings <br />• Phase implementation of electrification into existing municipal buildings. <br />