My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
110221
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 2:59:07 PM
Creation date
10/27/2021 2:31:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />Attachment 3- Proposed Goals, Strategies, and Actions <br />August 12, 2021 <br />Buildings & Energy <br />Goal <br />Reduce greenhouse gas emissions from buildings and associated energy consumption and increase buildings and energy resilience which will <br />result in cost savings, improved public health, and improved infrastructure. <br />Existing Ongoing Actions <br />Maintain highest EBCE choice for Maintain the highest renewable energy choice as the default for all municipal facilities, including opportunities to secure Power <br />municipal operations Purchase Agreements with other EBCE jurisdictions. <br />Maintain zero emissions energy as Maintain the default EBCE electricity service to ensure the community is receiving zero -emission energy, if economically feasible. <br />default East Bay Community Energy <br />(EBCE) choice <br />Strategy 1: Advance the decarbonization of buildings. <br />1001, All -electric reach code Adopt an all -electric building reach code for new construction that limits the development of new gas infrastructure where <br />! economically feasible. Ensure solutions are equitably tailored to different building, ownership, and use types. This will require a j <br />cost effectiveness evaluation and further outreach. Exceptions to the Code can be considered. <br />1164 Existing Building Develop and implement an Existing Building Electrification Plan to advance electrification of buildings. As a part of this effort: <br />Electrification Plan Grid Analysis/Improvements <br />• Work with EBCE, PG&E, and regional partners to ensure we have a robust regional electrical grid that minimizes the risk <br />of power outages, increases storage, and reduces demand for diesel or gas generators. Consider opportunities for local <br />renewable generation. <br />• Conduct an existing building electrification analysis to identify areas of opportunities, building types, and prerequisites <br />needed to make electrification cost-effective in the community. <br />Municipal Buildings <br />• Phase implementation of electrification into existing municipal buildings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.