My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
100521
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2021 11:01:47 AM
Creation date
9/30/2021 11:01:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/5/2021
EXPIRATION DATE
10/5/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> Ei-m" 399 Lindbergh Avenue <br /> Livermore, CA 94551 <br /> P 925.315.3151 <br /> ASSOCIATES www bskassociates.com <br /> Sent via email: hho@citvofpleasantonca.gov <br /> September 15, 2021 BSK Proposal GL21-21837B <br /> Mr. Huy Ho, PE <br /> Associate Civil Engineer <br /> City of Pleasanton <br /> P.O. Box 520, 200 Old Bernal Road <br /> Pleasanton, California 94566 <br /> SUBJECT: Revised Proposal for Geotechnical Pavement Investigation <br /> W. Las Positas Boulevard <br /> Pleasanton, California <br /> Dear Mr. Ho: <br /> As requested, BSK Associates (BSK) is pleased to present this proposal to the City of Pleasanton (City) to <br /> perform a geotechnical pavement investigation for the planned road reconstruction along West Las <br /> Positas Boulevard from Hopyard Road to Stoneridge Drive (Site).We have also included options to extend <br /> our investigation along West Las Positas from 1-680 to Hopyard Road and from Stoneridge Drive to Santa <br /> Rita Road.The purpose of our investigation will be to provide geotechnical recommendations and possible <br /> mitigation options for the project. We have based our proposal on the following: <br /> • Our site meeting with you on Monday, May 24, 2021, and communications with you and Mr. <br /> Adam Nelkie with the City, <br /> • Review of the existing geotechnical reports, provided by the City, for the area near the Site, <br /> including reports by Kleinfelderl and Engeo2, near Tassajara Creek, <br /> • Our experience with Bay Area soils, and <br /> • Our experience with similar projects. <br /> The following subsections present discussions regarding our understanding of the project, as well as a <br /> description of our proposed scope of services, our fee estimate, project schedule, and project limitations <br /> for your consideration. <br /> BSK is committed to providing quality service to its clients, commensurate with their wants, needs and <br /> desired level of risk. If a portion of this proposal does not meet the project's needs or if those needs have <br /> 'Report entitled "Geotechnical Investigation of Settlement of West Los(sic) Positas Boulevard at Tassajara Creek, <br /> Pleasanton, California", by Kleinfelder, Inc.dated December 10, 2010, File No: 112881/PW2 <br /> 2 Report entitled "Pavement Distress Mitigation, City of Pleasanton,West Las Positas Boulevard, Pleasanton, <br /> California" by Engeo, Inc., dated May 22, 2012, Project No. 6621.200.002 <br /> Environmental, Geotechnical, Construction Services,Analytical Testing-An Employee-Owned Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.