My WebLink
|
Help
|
About
|
Sign Out
06A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
093021
>
06A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 1:53:45 PM
Creation date
9/24/2021 1:52:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/30/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Curb extension and bulb -out at the intersection of <br />Palomino Drive and Concord Street to be installed <br />potential future improvements <br />h. Southbound Concord Street may be reconfigured <br />to have new vehicle queueing lane for school <br />traffic and a through lane. The vehicle queuing <br />lane would be added along the curb to the west <br />side of Concord Drive roughly between Kottinger <br />Drive and Reisling Ct. Vehicles queueing in this <br />lane could either enter the existing school loop <br />loading zone or the new school loading zone in <br />front of the school. Because this queueing lane is <br />along the curb, it allows motorists who wish to <br />travel south on Concord to bypass school traffic <br />using the through lane. Review of the new all way <br />stop performance will be analyzed to determine if <br />the queue lane is needed. <br />i. speed lumps on Palomino (petition is in <br />circulation and if the required 67% support is <br />achieved, speed lumps will be installed). <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Cedric Novenario <br />45. Junipero Street Transportation/Traffic Project <br />Junipero Traffic Calming <br />Residents along the western portion of Junipero have requested additional speed lumps to <br />complement the completed traffic calming project at Independence and Junipero. The <br />project will add one additional speed lump between Sonoma and Tomas way <br />• Status Completed <br />• Next Steps/Details: Expedited Speed Lump notices have been sent for two <br />petitions to residents within 500' of the proposed speed <br />lump locations. Residents were given two methods to <br />submit a petition: online (via QR code) or mailback a <br />petition. Not enough petition signatures were obtained by <br />the October 16 closing date. Thus, the project will not <br />proceed. The local resident champion was notified that the <br />project will not proceed. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Cedric Novenario <br />Regional Proiects <br />46. State Route 84 Transportation/Traffic Project <br />SR 84 <br />SR 84 from Pigeon Pass to I-680 has completed environmental review and Caltrans <br />adopted the environmental document in the summer of 2018. Preliminary engineering <br />Page 20 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.