My WebLink
|
Help
|
About
|
Sign Out
06 ATTACHMENTS 2-5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
06 ATTACHMENTS 2-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 11:24:16 AM
Creation date
9/16/2021 10:49:20 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
Document Relationships
06
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LANDSCAPE ARCHITECTURE DIVISION — 925-931-5672 <br />Landscaping <br />68 LANDSCAPING: Proposed landscaping shall be shown on the site plan and reviewed <br />and approved by the City Landscape Architect prior to building permit issuance. <br />Additional landscaping materials or modifications may be required by the Landscape <br />Architecture Division at final inspection to ensure adequate planting coverage and/or <br />screening. <br />69. WATER EFFICIENT LANDSCAPE ORDINANCE (WELD): The project shall comply with <br />the City of Pleasanton's Water Efficient Landscape Ordinance (WELO) and Bay Friendly <br />Basics Landscape Checklist. The applicant shall submit a Landscape Documentation <br />Package in PDF format to the Landscape Architecture Division, which shall be subject to <br />review and approval by the City Landscape Architect prior to building permit issuance. <br />The Landscape Documentation Package shall include: <br />a. Project Information; <br />b. Water Efficient Landscape Worksheet; <br />c. Soil management report; <br />d. Landscape design plan; <br />e. Irrigation design plan; and <br />f. Grading design plan. <br />70 CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final <br />inspection by the Building and Safety Division, the applicant's landscape architect shall <br />submit a Certificate of Completion Package in PDF format to the Landscape Architecture <br />Division for review and approval. The Certificate of Completion Package shall include: <br />a. Project information sheet; <br />b. Certificate of installation according to the landscape documentation package; <br />c. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br />71. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br />installed as shown on the approved building permit set and shall be inspected and <br />approved by the Landscape Architecture Division. <br />72. CONCRETE CURBS: 6 -inch vertical concrete curbs, with curb cuts or flush curbs with <br />wheel stops, if determined to be acceptable by the Director of Engineering/City Engineer <br />and Director of Community Development, shall be installed between all paved and <br />landscape areas, in conformance with the City's Standard Specifications and Details. <br />73. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br />seed mixture designed by the applicant's landscape architect and approved by the <br />Landscape Architecture Division prior to installation. The erosion control shall be <br />maintained by the applicant until permanent landscaping is in place. <br />P21-0076 & PUD -141 Planning Commission <br />Page 12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.