My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 10:24:26 AM
Creation date
9/16/2021 10:22:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
Document Relationships
05 ATTACHMENT 1 EXHIBIT B
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
05 ATTACHMENTS 2-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53. IMPROVEMENT PLAN AND MAP REVIEW FEES: The applicant shall pay all applicable <br />plan check review fees to the Engineering Department with the first submittal of the <br />improvement plans, grading plans, and parcel) map. <br />54. SUBDIVISION FEES — PARCEL MAPS: The applicant shall pay all subdivision fees to <br />the Engineering Department prior to Director of Engineering/City Engineer approval of the <br />parcel map at the rate in effect at the time of the approval for the total number of <br />buildable lots on the map. <br />55. IMPROVEMENT SECURITY — PARCEL MAPS: The applicant shall submit a <br />performance bond and labor and material bond, or other improvement security <br />acceptable to the Director of Engineering/City Engineer, for all private and public <br />subdivision improvements necessary to serve the subdivision to the Engineering <br />Department prior to Director of Engineering/City Engineer approval of the parcel map. <br />Both bonds shall be in an amount equal to 100 percent of the cost estimate as approved <br />by the Director of Engineering/City Engineer. The improvement security may be waived if <br />the necessary improvements have been constructed to the satisfaction of the Director of <br />Engineering/City Engineer prior to City Engineer approval of the parcel map. <br />56. WARRANTY BOND: The applicant shall submit a one-year warranty bond in an amount <br />of 10 percent of the full value of all public subdivision improvements necessary to serve <br />the subdivision to the Engineering Department prior to City Council acceptance of the <br />public subdivision improvements. <br />57. RECORDATION: The applicant's title company shall perform the following: <br />a. File the Certificate of Approval and Grant Deed(s) for record at the Alameda <br />County Clerk -Recorder's Office. <br />b. Upon recordation of the Grant Deed(s), the title company shall certify and note the <br />recording data on the 18 -inch X 26 -inch mylar and return the original mylar to the <br />Director of Engineering/City Engineer. <br />FIRE DEPARTMENT — 925-454-2361 <br />The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and <br />fire hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation <br />of the on-site fire mains and fire hydrants. Specific installation drawings submitted by the <br />licensed underground fire protection contractor shall be submitted to the Fire Prevention Bureau <br />for approval; and 2.) Backflow prevention or connections to the public water mains. <br />57. FIRE HAZARDS: The project developer shall keep the site free of fire hazards from the start <br />of lumber construction until the final inspection. <br />58. FIRE CODE: All construction shall conform to the requirements of the 2016 Pleasanton <br />Fire Code and local ordinances. All required permits shall be obtained prior to work <br />commencement. <br />PUD -140 & P21-0079 City Council <br />Page 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.