My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 10:24:26 AM
Creation date
9/16/2021 10:22:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
Document Relationships
05 ATTACHMENT 1 EXHIBIT B
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
05 ATTACHMENTS 2-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prevention Plan) Practitioner (QSP) for all projects disturbing 1 acre or more or by a <br />California licensed civil engineer or California licensed landscape architect for all projects <br />disturbing less than 1 acre of land, subject to the review and approval of the Director of <br />Engineering/City Engineer. All cut and fill slopes shall be hydromulched/hydroseeded and <br />stabilized immediately after the completion of grading work and in no case later than <br />October 1, unless otherwise approved by the Director of Engineering/City Engineer. No <br />grading shall occur between October 1 and April 30 unless erosion control measures are <br />in place, subject to the review and approval of the Director of Engineering/City Engineer. <br />Such measures shall be maintained until the permanent landscaping is completed to the <br />satisfaction of the Director of Engineering/City Engineer and the Notice of Termination for <br />the coverage under the Construction General Permit, if applicable, is approved by the <br />California State Water Resources Board. <br />49. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall <br />obtain an encroachment and haul route permit from the Engineering Department prior to <br />moving equipment to the project site or performing work in the public right of way or <br />within public easements. The applicant's contractor shall submit a completed and signed <br />encroachment permit application accompanied with six copies of City -approved <br />improvement plans, proof of insurance with endorsement adding the City as an additional <br />insured, a copy of a valid City of Pleasanton business license, applicable fees, and other <br />requirements determined by the Director of Engineering/City Engineer. <br />50. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall <br />repair damage to existing public and private improvements on and near the project site <br />and along the haul route at their full expense caused by construction activities as <br />determined and to the satisfaction of the Director of Engineering/City Engineer and prior <br />to the City Council acceptance of public improvements. <br />51. AS -BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit <br />signed and stamped as -built drawings and AutoCAD files for the construction of the <br />public improvements and stormwater treatment system subject to the review and <br />approval of the Director of Engineering/City Engineer and prior to the release of the <br />performance and labor and materials bond. <br />52. ACTING CITY SURVEYOR MAP REVIEW: The applicant shall submit a preliminary copy <br />of the parcel map, approved tentative map, preliminary title report(s), adjoining deeds, <br />and underlying recorded maps to the Director of Engineering/City Engineer, prior to <br />submittal of the first plan check. The Acting City Surveyor will provide a cost estimate to <br />review the map and certify it is technically correct in compliance with the California <br />Subdivision Map Act. The applicant shall submit full payment for the Acting City <br />Surveyor's fee and the City's administrative fee and all applicable plan check fees with <br />the first map plan check. Unspent Acting City Surveyor's fees will be refunded to the <br />applicant following recordation of the map. If the applicant withdraws their application in <br />writing prior to recordation of the map, unspent Acting City Surveyor's fees will be <br />refunded to the applicant. If the Acting City Surveyor's estimate is insufficient to cover <br />their services, the applicant shall pay the difference between the initial estimate and the <br />actual cost prior to submittal of the map for the Director of Engineering/City Engineer's <br />signature. <br />PUD -140 & P21-0079 City Council <br />Page 9 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.