My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 10:24:26 AM
Creation date
9/16/2021 10:22:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
Document Relationships
05 ATTACHMENT 1 EXHIBIT B
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
05 ATTACHMENTS 2-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cause of death and has made recommendations concerning treatment and dispositions <br />of the human remains to the person responsible for the excavation, or to their authorized <br />representative. A similar note shall appear on the building permit and/or improvement <br />plans. <br />Fees <br />29. FEES: The applicant shall pay any and all fees to which the property may be subject, <br />prior to issuance of grading and/or building permits, or prior to recordation of the final <br />map, whichever is applicable. The type and amount of the fees shall be those in effect at <br />the time the permit is issued. <br />30. WATER FEES AND WATER METER CONNECTION FEES: The applicant shall pay the <br />applicable Zone 7 and City connection fees and water meter cost for any water meters <br />and irrigation meters, if applicable, prior to building permit issuance. <br />31. SEWER FEES: The applicant shall pay the applicable Dublin -San Ramon Services <br />District (DSRSD) and City sewer permit fees prior to building permit issuance. <br />32. SCHOOL IMPACT FEES — RESIDENTIAL NEW CONSTRUCTION: Applicant shall work <br />with the Pleasanton Unified School District (PUSD) to develop a program to offset this <br />project's long term effect on school facility needs in Pleasanton. This program shall be <br />designed to fund school facilities necessary to offset this project's reasonably related <br />effect on the long-term need for expanded school facilities. The method and manner for <br />the provision of these funds and/or facilities shall be approved by the PUSD and in place <br />prior to building permit issuance. Written proof of compliance with this condition shall be <br />provided by applicant to the City, on a form generated by the PUSD, prior to building <br />permit issuance. <br />33. CONDITIONS OF APPROVAL: The applicant shall provide all initial buyers with copies of <br />the final project conditions of approval. <br />ENGINEERING DEPARTMENT — LAND DEVELOPMENT — 925-931-5650 <br />34. CLEAN WATER PROGRAM: According to Appendix L of the C.3 Technical Guidance <br />published by the Alameda Countywide Clean Water Program, single family residential <br />projects that create and/or replace 2,500 square feet or more of impervious surface are <br />considered "Small Projects" that must implement one of the following site design <br />measures to address pollution from storm water runoff: <br />a. Direct roof runoff into cisterns or rain barrels for use <br />b. Direct roof runoff onto vegetated areas <br />c. Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas <br />d. Direct runoff from driveways/uncovered parking lots onto vegetated areas <br />e. Construct sidewalks, walkways, and/or patios with permeable surfaces <br />f. Construct driveways, and/or uncovered parking areas with permeable surfaces <br />The applicant shall indicate on the plans which site design measure will be implemented. <br />Project specific condition. <br />PUD -140 & P21-0079 City Council <br />Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.