Laserfiche WebLink
A. Fertilization: Supply manufacturers data sheet for all soil amendments to Parks <br /> Superintendent for approval prior to incorporation. The Parks Superintendent may at <br /> his/her discretion take and test soil samples for fertility and other factors and suggest <br /> changes in the soil chemistry. The contractor at no additional cost shall follow these <br /> recommendations. Supply Parks Superintendent with materials tags for verification of <br /> work. <br /> B. Annuals replacement. Four(4)times each year(exact timing and species/colors to be <br /> agreed upon by City and Contractor)replace annual plants in the planter-bowls. The <br /> species and color of the annual plants may vary; the Parks Superintendent shall <br /> determine the container size and quantity. The plant material will be billed as'extra <br /> work' in accordance with the Schedule of Values. <br /> SECTION 6. MONTHLY MAINTENANCE <br /> A. Irrigation: All lateral lines shall be flushed out at least once per month after removing <br /> the last multi-outlet emitter or two at each end of the lateral line. <br /> B. Fertilization: Fertilize plants twice monthly with a water-soluble fertilizer equal to <br /> Scott's Peters Professional 15-15-15 Geranium. Avoid applying fertilizer to the base of <br /> main stems; rather, spread evenly under plant to drip line. Rate shall be 350 ppm <br /> nitrogen. <br /> SECTION 7. WEEKLY MAINTENANCE <br /> A. Checking of plant material to include but not limited to pruning,thinning, and <br /> pinching-back is to be performed twice weekly on Monday and Friday of each week <br /> from April 1 to November 30, and no less than once weekly from December 1 to March <br /> 31. As directed by the Parks Superintendent,the Contractor shall take action to <br /> maintain plant size and shape to prevent overcrowding by aggressive species,prevent <br /> legginess, and promote or maintain the design concept. <br /> B. Irrigation: Visual checks of the irrigation system should be made on a weekly basis to <br /> ensure its proper operation. Check for any leaks, any loss or damage to equipment, <br /> proper operation of all emitters, and proper programming of automatic irrigation <br /> controller. Make any adjustments or repairs as necessary. <br /> Once established,watering schedules should be reviewed and adjusted on a weekly to <br /> monthly basis as needed to accommodate variations in rainfall and evapotranspiration <br /> (loss of water by evaporation through plant leaves). During the summer,plantings <br /> should be checked weekly to insure that optimum soil moisture exists. Hand watering <br /> may be required to some planter-bowls in the most exposed(sun,wind) locations. See <br /> Attachment VI I for irrigation controller locations and notes. <br /> Weed Control, litter removal, spent flowers: Keep planter-bowls weed free at all times. <br /> Litter and spent flowers should be removed no less than twice weekly from April 1 to <br /> November 30, and no less than once weekly from December 1 to March 31. <br /> Weeds that occur adjacent to the bowls as a result of bowl irrigation shall be controlled <br /> by the contractor as part of this contract. <br /> C. Replacement Plants: Dead plants and those in a state of decline should be replaced <br /> immediately(within 48 hours). Replacement plants should be of a size,condition and <br /> variety acceptable to the owner. <br /> D. Insect& Disease Control: Maintain a reasonable control with approved materials. <br /> Insecticides and fungicides are to be as approved by the City Parks Maintenance <br /> Supervisor. <br /> Page 19 <br />