Laserfiche WebLink
EXHIBIT A <br /> 5. COVID-19 WORK PLAN <br /> Our team is committed to providing a safe and healthy workplace for everyone. Catalyst Diving will develop, <br /> submit,and implement a COVID-19 Work Plan in addition to following COVID-i 9 safety protocols in adherence <br /> with the County's current ordinances. A few precautions Catalyst Diving will implement include: <br /> • Wearing masks in indoor public spaces, regardless of vaccination status; <br /> • In outdoor settings, masks will be recommended for both unvaccinated and vaccinated employees; <br /> • Social distancing in indoor and outdoor spaces. <br /> 6. RATE SHEET <br /> The cost quoted below includes all taxes and all other charges, including travel expenses, and is the cost the <br /> City will pay for the term of any contract that is a result of this bid. <br /> Table 2.Contractor's Labor Rates (Hourly) <br /> Position Deri> ; <br /> sc -: t,, =` ,I(_ <br /> DIVER $101.42 152.13 ! $101.42 <br /> TENDER $56.88 $85.32 $56.88 <br /> DIVER CONTROLLER $57.88 86.82 i $5788 <br /> Table 3.Contractor's Equipment Rates (Hourly) <br /> Equipmeri Descriptio <br /> ALL EQUIPMENT Travel expenses,taxes, and equipment $173.45/HouR <br /> COLORIMETER (HACH 8 O <br /> 9 ) Purchase of one (1) Colorimeter (Hach 890) $500.00/ITEM <br /> Table 4.Contractor's Material and Rental Rates <br /> Material/Rentals Description % Mark up <br /> LABORATORY TESTING Sediment sampling and testing 10% <br /> MATERIAL DISPOSAL Waste hauling and disposal fees 10% <br /> OTHER MATERIALS Any specific sediment discharge materials(i.e.,dichlorination 10% <br /> tablets or sediment bags) if required for job completion <br /> OTHER RENTAL EQUIPMENT Any specific sediment disposal equipment materials and 10% <br /> rental (i.e., baker tank, poly tank, etc.) if required for job <br /> completion <br /> rhe information provided in this document is trade secret and shat not be published without written consent <br /> 8 RFP FOR RESERVOIR INSPECTION, CLEANING AND REPAIRS <br />