Laserfiche WebLink
enhance the rural character of the building. Setback approximately 60 feet from the face <br />of the building as shown in Figure 2, the vaulted gym portion of the building will increase <br />in height to a maximum 30 feet tall, measured to the highest peak or ridge. The vaulted <br />and two-story portions of the building will be setback approximately 85 feet from the <br />property line. <br />The proposed church building is proposed to be approximately 33 feet in height for the <br />majority of the building, although the dome would extend up to a height of 53 feet, <br />6 -inches measured to its highest point. The building will be set back approximately <br />85 feet from the property line along Dublin Canyon Road. Figure 3, below, shows the <br />proposed architecture. <br />Figure 3: Proposed Architecture <br />VEST ELEYRION <br />Church Operations <br />The Church currently has approximately 200 pledged members, with weekly attendance <br />averaging approximately 138 persons for Sunday services. The Church believes they <br />can grow their congregation over the next 20 years to a maximum future of 350 <br />attendees. The largest service would be held on Sundays with worship services from <br />10:00 a.m. to 12:00 p.m., followed by Sunday school and other miscellaneous activities <br />from 12:00 p.m. to 5:00 p.m. The proposed weekly hours of operation for parish <br />Page 6 of 12 <br />