My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
081721
>
04 ATTACHMENT 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:19:24 PM
Creation date
8/12/2021 3:49:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/17/2021
DESTRUCT DATE
15Y
Document Relationships
04
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\081721
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project No. E9164-04-0 2 - 16 - April 15, 2020 <br />7. FURTHER GEOTECHNICAL SERVICES <br />7.1 Plan and Specification Review <br />7.1.1 We should review project plans and specifications prior to final design submittal to assess whether <br />our recommendations have been properly implemented and evaluate if additional analysis and/or <br />recommendations are required. <br />7.2 Testing and Observation Services <br />7.2.1 The recommendations provided in this report are based on the assumption that we will continue as <br />Geotechnical Engineer of Record throughout the construction phase and provide compaction testing <br />and observation services and foundation observations throughout the project. It is important to <br />maintain continuity of geotechnical interpretation and confirm that field conditions encountered are <br />similar to those anticipated during design. If we are not retained for these services, we cannot assume <br />any responsibility for others interpretation of our recommendations, and therefore the future <br />performance of the project.
The URL can be used to link to this page
Your browser does not support the video tag.