Laserfiche WebLink
36' - 0"DOME - STANDING SEAM METAL <br />TILE ROOF - TERRACOTTA COLOR - TYP. <br />LIMESTONEELDORADO STONE TYP. <br />WINDOW FRAMES - BRONZE COLOR W/ LOW-E GLASS TYP. <br />LIMESTONE <br />CEMENT PLASTER TYP. - LIGHT COLOR <br />DOME - STANDING <br />SEAM METAL TYP. <br />AB301 <br />2 34' - 7"AB300 <br />1 <br />36' - 0"DOME - STANDING SEAM METAL <br />TILE ROOF - TERRACOTTA COLOR - TYP. <br />ELDORADO STONE TYP. <br />CEMENT PLASTER TYP. - LIGHT COLOR <br />WINDOW / DOOR FRAMES - BRONZE COLOR W/ LOW-E GLASS TYP. <br />ELDORADO STONE TYP. <br />LIMESTONE <br />LIMESTONE <br />LIMESTONE <br />CEMENT PLASTER TYP. - LIGHT COLOR <br />ELDORADO STONE TYP <br />TERRA COTTA MOLDING <br />DOME - STANDING SEAM METAL <br />34' - 7"SHEET NO: <br />KEY PLAN: <br />ITEM: REVISION/ISSUE: DATE: <br />KEYNOTES <br />THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.DSA: <br />PROFESSIONAL STAMP: <br />3050 Pullman Street Costa Mesa, CA 92626 - T 714.338.1600 <br />3009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.1800 <br />4750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800 <br />AGENCY APPROVAL: <br />CONSULTANT:BIM 360://R9201 New RGOC/R9201_RGOC_2019.rvt6/28/2021 12:43:54 PMEXTERIOR <br />ELEVATIONS <br />AB221 <br />NEW RESURRECTION <br />GREEK ORTHODOX <br />CHURCH <br />11300 Dublin Canyon <br />Road, Pleasanton, CA <br />94588 <br />RESURRECTION GREEK <br />ORTHODOX CHURCH <br />PROJECT NO: R9201 <br />DRAWN BY: Author CHECKED BY: Checker <br />DATE: 4/17/2020 <br />1/8" = 1'-0"1 SOUTH ELEVATION <br />1/8" = 1'-0"2 WEST ELEVATION <br />0'5'10'20'30' <br />0'5'10'20'30' <br /> MATERIALES <br />1. CEMENT PLASTER - LIGHT COLOR <br />2. STONE - T.B.D. <br />3. TILE ROOF - TERACOTTA COLOR <br />4. WINDOW FRAMES - BRONZE COLOR W/ LOW-E GLASS <br />5. DOOM - STANDING SEAM METAL <br />A PRELIM INARY REVIEW 4/17/20 <br />B CO ST ESTIM ATING 10/12/20 <br />C ENTITLEM ENT PACKAGE 11/16/20 <br />D ENTITLEM ENT PACKAGE <br />REVISIO N <br />03/10/21 <br />E ENTITLEM ENT PACKAGE <br />REVISIO N <br />04/26/21 <br />G PLANNING CO M M ISSIO N 07/14/21