Laserfiche WebLink
properties or streets. The photometrics shall be reviewed and approved by the City <br /> Traffic Engineer and Director of Community Development prior to building permit <br /> issuance. The type and location of all exterior light fixtures shall be reviewed and <br /> approved by the Director of Community Development prior to building permit issuance. <br /> 10. BUILDING SURVEY: The applicant shall submit a building survey and/or record of <br /> survey and a site development plan in accordance with the provisions of Chapter 18.68 <br /> of the PMC. These plans shall be approved by the Chief Building Official prior to <br /> building permit issuance. The site development plan shall include all required <br /> information to design and construct site, grading, paving, drainage, and utilities. <br /> 11. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br /> certification prepared by a California licensed land surveyor or registered civil engineer <br /> to the Chief Building Official and Director of Community Development certifying the pad <br /> elevations and building locations (setbacks) are conforming to the approved plans, prior <br /> to receiving a foundation inspection for the structures. <br /> 12. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br /> certification prepared by a California licensed land surveyor or civil engineer to the <br /> Director of Community Development before the first framing or structural inspection by <br /> the Building and Safety Division. The height of the structures shall be surveyed and <br /> verified as being in conformance to the approved building heights as shown on Exhibit B <br /> or as otherwise conditioned. <br /> 13. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br /> occupancy. <br /> 14. TRANSFORMERS: New electrical transformers shall be placed underground, or <br /> aboveground and screened from view to the satisfaction of the Director of Community <br /> Development. Details of the new electrical transformers, and any screening <br /> architecturally compatible with the building, shall be included in the building permit <br /> submittal and shall be subject to the review and approval of the Director of <br /> Engineering/City Engineer and Director of Community Development prior to building <br /> permit issuance. <br /> 15. MECHANICAL EQUIPMENT — SCREENING: The applicant shall effectively screen <br /> from view all ducts, meters, air conditioning equipment, and any other mechanical <br /> equipment, whether on the structure, on the ground, or on the roof, with materials <br /> architecturally compatible with the building. Screening details shall be shown on the <br /> plans submitted for building permit, the adequacy of which shall be determined by the <br /> Director of Community Development. All required screening shall be installed prior to <br /> final occupancy. <br /> 16. PHOTOVOLTAIC SYSTEM: The building shall be constructed to allow for future <br /> installation of a photovoltaic (PV) system. The project applicant shall comply with the <br /> following requirements for making the building photovoltaic-ready: <br /> P18-0217 and P18-0218 Planning Commission <br /> Page 3 of 14 <br /><br /> nuisances as a result of the proposed use. <br />and <br />anta Rita Road Planning Commission <br /> Page 20 of 21 <br /> area shall drain into the trash <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 17 of 21 <br />25, 2350 Santa Rita Road Planning Commission <br /> Page 15 of 21 <br />g Commission <br /> Page 3 of 21 <br />