Laserfiche WebLink
b. A construction truck route shall be designated to keep all construction traffic away <br /> from nearby residential streets. Prior to construction, the construction traffic route, <br /> construction hours, and contact names and telephone numbers shall be posted on <br /> the driveway entrances, throughout the construction site, and in any construction <br /> trailer(s). <br /> c. Comprehensive traffic control measures shall be implemented, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. If <br /> necessary, as determined by the City Traffic Engineer, proper lane closure <br /> procedures such as flagger stations, signage, cones, and other warning devices <br /> shall be implemented during construction. <br /> d. The haul route for all materials to and from this development shall be approved by <br /> the City Engineer prior to the issuance of a permit, and shall include the provision <br /> to monitor the street surfaces used for the haul route so that any damage and <br /> debris attributable to the haul trucks is identified and corrected at the expense of <br /> the project applicant or developer. <br /> e. All internal combustion engines used for grading or construction shall be equipped <br /> with a muffler equal to or better than that supplied by the vehicle manufacturer. All <br /> equipment shall be maintained in good mechanical condition so as to minimize <br /> noise and air pollution from a faulty engine, drive train, or other components. No <br /> muffler or exhaust system shall be equipped with cutout, bypass, or similar device <br /> intended to thwart quieting. <br /> f. Dust control best management practices, as approved by the City Engineer, shall <br /> be followed at all times during grading and construction operations. Such <br /> measures may include watering of exposed surfaces twice a day, and more <br /> frequent watering when wind speeds exceed 15 mph; covering of stockpiled earth; <br /> and covering of trucks hauling dirt if windy conditions prevail. Failure to keep dust <br /> under control may result in the stoppage of all work until a modified plan <br /> acceptable to the City Engineer is approved and implemented. <br /> g. Except for security trailers staffed by licensed security personnel, at no time shall <br /> campers, trailers, motor homes, or any other vehicle be used as living or sleeping <br /> quarters on the construction site. All such vehicles shall be removed from the site <br /> at the end of each workday. Construction trailers shall be allowed to be placed on <br /> the project site for daily administration/coordination purposes during the <br /> construction period. <br /> Landscape Architecture Division <br /> 23. The developer shall comply with the recommendations of the Arborist Report dated <br /> September 5, 2017, on file with the Planning Division. Details of the recommendations <br /> shall be submitted in conjunction with the plans submitted for issuance of building <br /> permits and shall be subject to review and approval by the Director of Community <br /> Development prior to issuance of building permits for the project. <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 5 of 21 <br />s. <br /> 15. All heating, ventilation, and air conditioning (HVAC) equipment, satellite receiving <br /> stations, etc., shall be located within the building's roof-equipment wells, and shall <br /> project no higher than a horizontal plane defined by the top-edge of the equipment <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 3 of 21 <br />