My WebLink
|
Help
|
About
|
Sign Out
ORD 2217
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:55 PM
Creation date
7/23/2021 10:05:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
7/20/2021
DESTRUCT DATE
PERMANENT
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2217 <br /> Page 9 <br /> may be allowed, subject to the approval of the Director of Community Development if <br /> found to be in substantial conformance with the "Approved Plans." (Project Specific <br /> Condition) <br /> Site Development and Building Design <br /> 9. BUILDING MATERIALS AND COLORS: The building materials and colors in the <br /> Approved Plans shall be stated on the building permit plans. <br /> 10. PAVING MATERIALS: The color, material, design, and product specifications for the <br /> paving materials used on-site shall be in conformance with the Approved Plans and <br /> included with the building permit submittal. Any proposed modifications to the final <br /> paving design details shall be subject to review and approval by the Planning Division <br /> prior to issuance of building permits. <br /> 11. WINDOWS: Manufacturer type, design, material, and installation details for all windows <br /> within the project shall be specified for each unit/building in conformance with the <br /> Approved Plans in the building permit submittal. Any proposed modifications shall be <br /> subject to review and approval by the Planning Division prior to issuance of building <br /> permits. <br /> 12. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive <br /> sign program submitted to the Planning Division under a separate application. <br /> 13. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the <br /> building permit submittal. The design and location must be approved by the Planning <br /> Division and comply with all setback requirements. <br /> 14. OUTDOOR STORAGE: There is to be no outdoor storage without prior approval by the <br /> City. <br /> 15. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit <br /> submittal. The plan shall include photometric contours, manufacturer's specifications on <br /> the fixtures, and mounting heights. All exterior lighting including landscape lighting shall <br /> be directed downward and designed or shielded so as to not shine onto neighboring <br /> properties or streets. The photometrics shall be reviewed and approved by the City <br /> Traffic Engineer and Director of Community Development prior to building permit <br /> issuance. The type and location of all exterior light fixtures shall be reviewed and <br /> approved by the Director of Community Development prior to building permit issuance. <br /> 16. BUILDING SURVEY: The applicant shall submit a building survey and/or record of <br /> survey and a site development plan in accordance with the provisions of Chapter 18.68 <br /> of the PMC. These plans shall be approved by the Chief Building Official prior to building <br /> permit issuance for buildings or site improvements in each phase. The site development <br /> plan shall include all required information to design and construct site, grading, paving, <br /> drainage, and utilities. <br /> 17. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br /> certification prepared by a California licensed land surveyor or registered civil engineer <br /> to the Chief Building Official and Director of Community Development certifying the pad <br /> elevations and building locations (setbacks) are conforming to the approved plans, prior <br /> to receiving a foundation inspection for structures in each phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.