Laserfiche WebLink
Ordinance No. 2217 <br /> Page 26 <br /> TRAFFIC ENGINEERING DIVISION —925-931-5677 <br /> 113. PHASE 1 TRAFFIC IMPACT ANALYSIS (TIA) MITIGATION MEASURES: The applicant <br /> shall comply with the mitigation measures identified in the project TIA, prepared by Fehr <br /> & Peers dated March 2021, to the satisfaction of the City's Traffic Engineer. These <br /> mitigation measures include the following Development Agreement provisions: <br /> a. Construct a westbound buffered bike lane on Stoneridge Drive or alternate facility <br /> if approved by the City's Traffic Engineer along the southern Property frontage <br /> (Mitigation 1 in TIA). <br /> b. Construct "cycle track" facility along the northern Property frontage that is <br /> adjacent to Stoneridge Mall Road or alternate mixed-use path if approved by the <br /> City's Traffic Engineer (Mitigation 2 in TIA). <br /> 1. Developer shall provide a 15-foot-wide Public Service Easement (PSE) to <br /> allow for the construction and public use of the cycle track or mixed-use <br /> path. <br /> 2. The cycle track shall include modifications at both adjacent intersections to <br /> allow for safe access and egress. <br /> c. Construct a mixed-use path along the east side of the property. (Mitigation 2 in <br /> TIA). <br /> d. Construct improvements at Stoneridge Mall Road and Genomics Place. <br /> Improvements include the conversion of the westbound through lane to a second <br /> westbound left turn lane and conversion of the westbound right turn lane into a <br /> through plus right lane. (Condition of Approval 2 in the TIA). (Project Specific <br /> Condition) <br /> 114. PHASE 2 TRAFFIC IMPACT ANALYSIS (TIA) MITIGATION MEASURES: The applicant <br /> shall comply with the mitigation measures identified in the project TIA, prepared by Fehr <br /> & Peers dated March 2021, to the satisfaction of the City's Traffic Engineer. These <br /> mitigation measures include the following Development Agreement provisions: <br /> a. Construct a traffic signal or bond for future signalization at the intersection of <br /> Springdale Avenue and the Project driveway (Mitigation 3 in the TIA). <br /> b. Construct the following improvements at the Stoneridge Drive and Springdale <br /> Avenue intersection (Mitigation 4 in the TIA). <br /> 1. Extend eastbound left turn pocket to provide a total of 200 feet of storage. <br /> 2. Convert the existing southbound left/through combination lane to a <br /> southbound left turn only lane. <br /> 3. Convert the existing southbound right turn lane to a southbound <br /> through/right combination lane. <br /> 4. Modify northbound approach to allow simultaneous northbound and <br /> southbound left turns. (Project Specific Condition) <br /> 115. Traffic/Parking Monitoring: If the operation of this use results in conflicts/complaints <br /> pertaining to parking and/or traffic/circulation, at the discretion of the Director of <br /> Community Development, the applicant shall be required to provide existing parking and <br /> employee counts to the City's Traffic Engineer for review. If necessary, the City's Traffic <br /> Engineer may require site and/or operational modifications, including additional parking, <br /> to the use to mitigate any impacts. The applicant shall provide the requested information <br /> to the City's Traffic Engineer within 30 days of any request. (Project Specific <br /> Condition) <br />