Laserfiche WebLink
Ordinance No.2217 <br /> Page 25 <br /> d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or <br /> disposed within the dripline of the trees or in drainage channels, swales, or <br /> areas that may lead to the dripline. <br /> e. No sign, wires, or ropes shall be attached to the trees. <br /> f. No stockpiling/storage of construction materials, fill, etc., shall take place <br /> underneath or within 5-feet of the dripline of the existing trees. <br /> g. No equipment or temporary structures shall be placed within or beneath the <br /> dripline of the existing trees. <br /> Failure to comply with these requirements may result in a "stop work order". <br /> 108. PARKING LOT TREES: Per California Green Building Code, there shall be a minimum <br /> of 50 percent shade cover in the parking area within 15 years. There shall be a minimum <br /> of 20 percent shade cover in any commercial landscape areas within 15 years. There <br /> shall be a minimum of 20 percent shade cove over any hardscape areas in a non- <br /> residential environment within 15 years. (Project Specific Condition) <br /> 109. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to <br /> review and approval by the City Landscape Architect prior to building permit issuance. <br /> OPERATIONS SERVICES DEPARTMENT— ENVIRONMENTAL SERVICES/UTILITIES <br /> DIVISION —925-931-5500 <br /> 110. SEWER LINE: Any sewer lines shall be private from the new manhole on both <br /> Stoneridge Mall Road and Springdale Avenue into the development. Prior to building <br /> permit submittal, the project plans shall be revised to reflect this requirement. (Project <br /> Specific Condition) <br /> 111. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be <br /> designed and installed in accordance with current City Standards 704, 705, 706; State <br /> Health and Safety Code; Title 17; and as required by the Director of Operations and <br /> Water Utilities. All backflow preventer assemblies shall be tested and certified by a City <br /> approved tester with the certification submitted to the City's contractor, Aqua Backflow. <br /> Testing will be performed at the time City water is turned on to the site. If an existing <br /> backflow preventer is on the site it shall be tested and certified by an approved tester <br /> with the certification submitted to the City's contractor, Aqua Backflow, before project <br /> water is drawn through it. An all-weather cover shall be placed over all backflow <br /> prevention assemblies 4 inch and smaller. <br /> 112. RECYCLED WATER: Recycled water should be used on site during the grading and <br /> construction period. However, under any declared stage of water shortage, recycled <br /> water must be used throughout the grading and construction period. <br />