Laserfiche WebLink
Ordinance No.2217 <br />Page 25 <br />d. No oil, gasoline, chemicals, or other harmful materials shall be deposited or <br />disposed within the dripline of the trees or in drainage channels, swales, or <br />areas that may lead to the dripline.e. No sign, wires, or ropes shall be attached to the trees.f. No stockpiling/storage of construction materials, fill, etc., shall take place <br />underneath or within S-feet of the dripline of the existing trees.g. No equipment or temporary structures shall be placed within or beneath the <br />dripline of the existing trees. <br />Failure to comply with these requirements may result in a "stop work orde/'. <br />108. PARKING LOT TREES: Per California Green Building Code, there shall be a minimum <br />of 50 percent shade cover in the parking area within 15 years. There shall be a minimum <br />of 20 percent shade cover in any commercial landscape areas within 15 years. There <br />shall be a minimum of 20 percent shade cove over any hardscape areas in a non- <br />residential environment within 15 years. (Project specffrc condition) <br />109. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to <br />review and approval by the City Landscape Architect prior to building permit issuance. <br />OPERATIONS SERVIGES DEPARTM ENT - ENVIRON M ENTAL SERVIGES/UTILITIES <br />DtvtsroN - 925-931 -5500 <br />110. SEWER LINE: Any sewer lines shall be private from the new manhole on both <br />Stoneridge Mall Road and Springdale Avenue into the development. Prior to building <br />permit submittal, the project plans shall be revised to reflect this requirement. (Project <br />Specific Condition) <br />111 BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be <br />designed and installed in accordance with current City Standards 704, 705, 706; State <br />Health and Safety Code; Title 17; and as required by the Director of Operations and <br />Water Utilities. All backflow preventer assemblies shall be tested and certified by a City <br />approved tester with the certification submitted to the City's contractor, Aqua Backflow. <br />Testing will be performed at the time City water is turned on to the site. lf an existing <br />backflow preventer is on the site it shall be tested and certified by an approved tester <br />with the certification submitted to the City's contractor, Aqua Backflow, before project <br />water is drawn through it. An all-weather cover shall be placed over all backflow <br />prevention assemblies 4 inch and smaller. <br />112. RECYCLED WATER: Recycled water should be used on site during the grading and <br />construction period. However, under any declared stage of water shortage, recycled <br />water must be used throughout the grading and construction period.