My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
072021
>
18 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 2:12:33 PM
Creation date
7/15/2021 11:13:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/20/2021
DESTRUCT DATE
15Y
Document Relationships
18
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\072021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />DRAFT – June 15, 2021 | Page 43 <br />THE CITY OF PLEASANTON <br />SB 1383 ACTION PLAN <br />2021 ─ 2025 <br />3.6 Education and Outreach <br /> <br />3.6.5 Step-by-Step Action Plan <br />Figure 19: Education and Outreach Step-by-Step Action Plan <br />ID # Action Item Collaborators Timeframe <br />1 Identify an approach to, and timing for, integration of each <br />education requirement into current programs. <br />City, PGS, <br />StopWaste, <br />Consultant <br />Jun 2021 <br />2 Kick-off Go Green Initiative project for SB 1383 education. City Jun 2021 <br />3 <br />Confirm approach for addressing SB 1383 education and <br />finalize timeline for revisions to and review of various <br />education pieces. <br />City, PGS, <br />Consultant Jun - Aug 2021 <br />4 Revise current webpages to integrate SB 1383 information. City, PGS, <br />StopWaste Aug -Sep 2021 <br />5 Design and print implementation education mailer (2 per <br />unit) and water utility bill insert. City Aug - Oct 2021 <br />6 Distribute pre-implementation collection program mailer <br />and bill insert to all generators. City Oct - Dec 2021 <br />7 <br />Educate all customers (i.e., single-family, multi-family, and <br />commercial) about new organics program during technical <br />assistance or service changes. <br />PGS Oct – Dec 2021 <br />8 <br />Annually provide organic waste generators (including self- <br />haulers) with information on: properly separating materials; <br />preventing organics waste; methane reductions; approved <br />haulers; health and environmental impacts of landfill <br />disposal; and, other requirements (§18985.1 and <br />§18985.2[1]). <br />City & PGS January 2022 <br />(annually) <br />9 <br />Annually provide edible food generators with information <br />regarding the jurisdiction’s edible food recovery program, <br />generator requirements, food recovery organizations, and <br />other requirements under §18985.1 and §18985.2. <br />StopWaste Jan 1, 2022 <br />(annually) <br />10 Evaluate renewal of Go Green Initiative contract for on-going <br />SB 1383 education support and community engagement. City Dec 2023 <br />(annually) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.