measured to the highest peak or ridge (reduced in size from the previous design presented at
<br /> the Planning Commission work session). The vaulted and two-story portions of the building will
<br /> be setback approximately 85 feet from the property line.
<br /> The proposed church building is proposed to be approximately 33 feet in height for the majority
<br /> of the building with the dome extending up to a height of 53 feet, 6 inches measured to the
<br /> highest point of the dome. The building will be setback approximately 85 feet from the property
<br /> line along Dublin Canyon Road. Figure 3, below, shows the proposed architecture.
<br /> Figure 3: Proposed Architecture
<br /> . Mw
<br /> 41 fiiiiiii;0 ,-, . *.
<br /> I 17:
<br /> rr
<br /> -- ""iiii'.4''..10141111rnia'"""Walide
<br /> N ok A in «I
<br /> ... .-v " I. w .. _ U .. 1 . ! ,:°: n , 3,,,, _ _.
<br /> .
<br /> 50JTH E;Eu+1 I
<br /> •a
<br /> .
<br /> .0111.610160 toil 40kn .:
<br /> v.Esr EtEv.x.
<br /> Church Operations
<br /> The Church currently has approximately 200 pledged members, with weekly attendance
<br /> averaging approximately 138 persons for Sunday services. The Church believes they can grow
<br /> their congregation over the next 20-years to a maximum future of 350 attendees. The largest
<br /> service would be held on Sundays with worship services from 10:00 a.m. — 12:00 p.m.,
<br /> followed by Sunday school and other miscellaneous activities from 12:00 p.m. — 5:00 p.m. The
<br /> proposed weekly hours of operation for parish activities are generally Monday through Friday
<br /> 8:00 a.m. to 9:30 p.m. with the majority of weekday activities scheduled between 6:30 p.m. to
<br /> 9:00 p.m. On Saturdays, most activities will take place between 8:00 a.m. to 5:00 p.m., (the
<br /> exception for Saturdays would be wedding and baptism receptions which would be allowed to
<br /> go until 11:00 p.m.) Typical weekly operations include Orthodox Youth League practices for
<br /> volleyball and basketball, as well as meetings of other groups such as the Girl and Boy Scouts
<br /> PUD-114-01M, 11300 Dublin Canyon Road Planning Commission
<br /> 7 of 15
<br />d around the church building which includes more finely detailed
<br /> finishes, entry, and a distinctive copper-roofed dome.
<br /> The proposed multi-purpose building has been designed with varying roof heights with a
<br /> single-story, approximately 17 foot tall portion of the building fronting along Dublin Canyon
<br /> Road that would include the projects kitchen and storage areas. The front elevation will include
<br /> stone gable end pop-outs that will break up the long elevation and enhance the rural character
<br /> of the building. Setback approximately 60 from the face of the building as shown in Figure 2,
<br /> the vaulted gym portion of the building will increase in height to a maximum 30 feet tall,
<br /> PUD-114-01M, 11300 Dublin Canyon Road Planning Commission
<br /> 6 of 15
<br />four lots in accordance with the PUD approval. A two-year extension of the map approval
<br /> was originally granted on April 26, 2019 with an additional one-year extension granted on April
<br /> 9, 2021; however the map has not been recorded.
<br /> The conditions of approval for PUD-114 stated the residential lots covered by the PUD
<br /> development plan would be subject to the permitted and conditional uses of the One-Family
<br /> Residential District, and the agriculturally zoned portion of the lot covered by the PUD
<br /> PUD-114-01M, 11300 Dublin Canyon Road Planning Commission
<br /> 2 of 15
<br />g calculations of the
<br /> PUD-114-01M& P20-0995 Planning Commission
<br /> Page 16 of 25
<br /> PUD-114-01M& P20-0995 Planning Commission
<br /> Page 3 of 25
<br />YCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM
<br /> ;-----fk;s7,4G
<br /> il
<br /> 3`
<br /> • kst • .7
<br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,...
<br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/
<br /> \ ‘ 111-,-,: .
<br /> ,..... i ..., i
<br /> 1:11,343
<br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16
<br /> I i II May 10,2021 FLEA:.,ANTON.
<br /> 0 650 1,300 Feet
<br /> |