the encroachment, grading, or subdivision permit, whichever occurs first, unless
<br /> otherwise approved by the Director of Engineering/City Engineer.
<br /> 49. SUBDRAINS: The curb and gutter along the proposed public and private streets shall
<br /> have a subdrain installed at either the back of the curb or lip of gutter in compliance with
<br /> the City Standard Specifications and Details in effect at the time of issuance of the
<br /> encroachment, grading, or subdivision permit, whichever occurs first. Sub-drains shall be
<br /> connected to the storm drain system or drained by other means acceptable to the
<br /> Director of Engineering/City Engineer.
<br /> 50. EROSION CONTROL MEASURES FOR SUBDIVISIONS: The applicant shall submit an
<br /> erosion control plan designed by a certified Qualified SWPPP (Stormwater Pollution
<br /> Prevention Plan) Practitioner (QSP) for all projects disturbing 1 acre or more or by a
<br /> California licensed civil engineer or California licensed landscape architect for all projects
<br /> disturbing less than 1 acre of land, subject to the review and approval of the Director of
<br /> Engineering/City Engineer. All cut and fill slopes shall be hydromulched/hydroseeded and
<br /> stabilized immediately after the completion of grading work and in no case later than
<br /> October 1 , unless otherwise approved by the Director of Engineering/City Engineer. No
<br /> grading shall occur between October 1 and April 30 unless erosion control measures are
<br /> in place, subject to the review and approval of the Director of Engineering/City Engineer.
<br /> Such measures shall be maintained until the permanent landscaping is completed to the
<br /> satisfaction of the Director of Engineering/City Engineer and the Notice of Termination for
<br /> the coverage under the Construction General Permit, if applicable, is approved by the
<br /> California State Water Resources Board.
<br /> 51 . ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall
<br /> obtain an encroachment and haul route permit from the Engineering Department prior to
<br /> moving equipment to the project site or performing work in the public right of way or
<br /> within public easements. The applicant's contractor shall submit a completed and signed
<br /> encroachment permit application accompanied with six copies of City-approved
<br /> improvement plans, proof of insurance with endorsement adding the City as an additional
<br /> insured, a copy of a valid City of Pleasanton business license, applicable fees, and other
<br /> requirements determined by the Director of Engineering/City Engineer.
<br /> 52. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall
<br /> repair damage to existing public and private improvements on and near the project site
<br /> and along the haul route at their full expense caused by construction activities as
<br /> determined and to the satisfaction of the Director of Engineering/City Engineer and prior
<br /> to the City Council acceptance of public improvements.
<br /> 53. AS-BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit
<br /> signed and stamped as-built drawings and AutoCAD files for the construction of the
<br /> public improvements and stormwater treatment system subject to the review and
<br /> approval of the Director of Engineering/City Engineer and prior to the release of the
<br /> performance and labor and materials bond.
<br /> 54. ACTING CITY SURVEYOR MAP REVIEW: The applicant shall submit a preliminary copy
<br /> of the parcel map, approved tentative map, preliminary title report(s), adjoining deeds,
<br /> P21-0076 & PUD-141 Planning Commission
<br /> Page 9 of 16
<br /> Page 5 of 16
<br /><br /> , ..'itiovvittcl.,d--:_-_-:_--- ---.1, --,.,,c-v-,,t, ._,A g
<br /> -,1
<br /> 1--J
<br /> It WAYCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM
<br /> ;-----fk;s7,4G
<br /> il
<br /> 3`
<br /> • kst • .7
<br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,...
<br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/
<br /> \ ‘ 111-,-,: .
<br /> ,..... i ..., i
<br /> 1:11,343
<br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16
<br /> I i II May 10,2021 FLEA:.,ANTON.
<br /> 0 650 1,300 Feet
<br /> |