My WebLink
|
Help
|
About
|
Sign Out
4_Exhibits A & C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2021
>
07-14
>
4_Exhibits A & C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 12:47:09 PM
Creation date
7/7/2021 12:46:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/14/2021
DESTRUCT DATE
15Y
Document Relationships
4
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\07-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the <br /> building permit submittal. The design and location must be approved by the Planning <br /> Division and comply with all setback requirements. <br /> 12. OUTDOOR STORAGE: There is to be no outdoor storage without prior approval by the <br /> City. <br /> 13. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit <br /> submittal. The plan shall include photometric contours, manufacturer's specifications on <br /> the fixtures, and mounting heights. All exterior lighting including landscape lighting shall <br /> be directed downward and designed or shielded so as to not shine onto neighboring <br /> properties or streets. The photometrics shall be reviewed and approved by the City <br /> Traffic Engineer and Director of Community Development prior to building permit <br /> issuance. The type and location of all exterior light fixtures shall be reviewed and <br /> approved by the Director of Community Development prior to building permit issuance. <br /> 14. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey <br /> and a site development plan in accordance with the provisions of Chapter 18.68 of the <br /> PMC. These plans shall be approved by the Chief Building Official prior to building permit <br /> issuance. The site development plan shall include all required information to design and <br /> construct site, grading, paving, drainage, and utilities. <br /> 15. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br /> certification prepared by a California licensed land surveyor or registered civil engineer to <br /> the Chief Building Official and Director of Community Development certifying the pad <br /> elevations and building locations (setbacks) are conforming to the approved plans, prior <br /> to receiving a foundation inspection for the structures. <br /> 16. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br /> certification prepared by a California licensed land surveyor or civil engineer to the <br /> Director of Community Development before the first framing or structural inspection by <br /> the Building and Safety Division. The height of the structures shall be surveyed and <br /> verified as being in conformance to the approved building heights as shown on Exhibit B <br /> or as otherwise conditioned. <br /> 17. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br /> occupancy. <br /> Green Building and Sustainability Measures <br /> 18. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: All residences shall be <br /> constructed to allow for future installation of a photovoltaic (PV) system and a solar water <br /> heating system. The measures shall be shown on the building permit plans for review <br /> and approval by the Director of Community Development prior to building permit <br /> issuance. The applicant shall provide the future owners the necessary information <br /> delineating the means by which photovoltaic panels can be applied to the roofs of the <br /> structures covered by this approval. This information shall be reviewed and approved by <br /> the Director of Community Development prior to occupancy of the first unit. The applicant <br /> PUD-140 & P21-0079 Planning Commission <br /> Page 3 of 15 <br /> Planning Commission <br /> Page 14 of 15 <br />ordation of the map, unspent Acting City Surveyor's fees will be <br /> refunded to the applicant. If the Acting City Surveyor's estimate is insufficient to cover <br /> their services, the applicant shall pay the difference between the initial estimate and the <br /> actual cost prior to submittal of the map for the Director of Engineering/City Engineer's <br /> signature. <br /> PUD-140 & P21-0079 Planning Commission <br /> Page 9 of 15 <br />ack before the <br /> Planning Commission Minutes Page 3 of 8 May 26, 2021 <br />