Laserfiche WebLink
Building ConstructionSweepers/Scrubbers14.00640.46Building ConstructionGenerator Sets08.00840.74Building ConstructionForklifts08.00890.20Building ConstructionCranes14.002310.29Building ConstructionCement and Mortar Mixers12.0090.56Building ConstructionAerial Lifts28.00630.31DemolitionTractors/Loaders/Backhoes08.00970.37DemolitionSweepers/Scrubbers14.00640.46DemolitionRubber Tired Dozers08.002470.40DemolitionOther Construction Equipment48.001720.42DemolitionOff-Highway Trucks88.004020.38DemolitionExcavators08.001580.38Load FactorDemolitionConcrete/Industrial Saws08.00810.73Acres of Grading (Site Preparation Phase): 0Acres of Grading (Grading Phase): 0Acres of Paving: 1.35Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 172,500; Non-Residential Outdoor: 57,500; Striped Parking Area: OffRoad EquipmentPhase NameOffroad Equipment TypeAmount Usage Hours Horse Power354 Architectural CoatingArchitectural Coating 1/10/2022 5/13/20225 903 PavingPaving1/10/2022 2/25/20225242 Building ConstructionBuilding Construction 12/11/2021 5/13/20225 110End Date Num Days WeekNum Days Phase Description1 DemolitionDemolition11/9/2021 12/10/202153.0 Construction DetailConstruction PhasePhase NumberPhase Name Phase Type Start DateAppendix APage 74