My WebLink
|
Help
|
About
|
Sign Out
20 Attachment 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
061521
>
20 Attachment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2021 4:43:16 PM
Creation date
6/8/2021 4:29:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
15Y
Document Relationships
20
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\061521
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building ConstructionSweepers/Scrubbers14.00640.46Building ConstructionGenerator Sets08.00840.74Building ConstructionForklifts08.00890.20Building ConstructionCranes14.002310.29Building ConstructionCement and Mortar Mixers12.0090.56Building ConstructionAerial Lifts28.00630.31DemolitionTractors/Loaders/Backhoes08.00970.37DemolitionSweepers/Scrubbers14.00640.46DemolitionRubber Tired Dozers08.002470.40DemolitionOther Construction Equipment48.001720.42DemolitionOff-Highway Trucks88.004020.38DemolitionExcavators08.001580.38Load FactorDemolitionConcrete/Industrial Saws08.00810.73Acres of Grading (Site Preparation Phase): 0Acres of Grading (Grading Phase): 0Acres of Paving: 1.35Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 172,500; Non-Residential Outdoor: 57,500; Striped Parking Area: OffRoad EquipmentPhase NameOffroad Equipment TypeAmount Usage Hours Horse Power354 Architectural CoatingArchitectural Coating 1/10/2022 5/13/20225 903 PavingPaving1/10/2022 2/25/20225242 Building ConstructionBuilding Construction 12/11/2021 5/13/20225 110End Date Num Days WeekNum Days Phase Description1 DemolitionDemolition11/9/2021 12/10/202153.0 Construction DetailConstruction PhasePhase NumberPhase Name Phase Type Start DateAppendix APage 74
The URL can be used to link to this page
Your browser does not support the video tag.