Laserfiche WebLink
Acres of Grading (Site Preparation Phase): 0Acres of Grading (Grading Phase): 132Acres of Paving: 5.4Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 225,000; Non-Residential Outdoor: 75,000; Striped Parking Area: 306 Architectural Coating Architectural Coating 7/26/2021 11/8/2021 5 765 Paving Paving 7/26/2021 9/3/2021 5444 Building Construction Building Construction 7/1/2021 11/8/2021 5 933 Grading Grading 4/30/2021 6/30/2021 5542 Demolition Demolition 4/2/2021 4/29/2021 5 20End Date Num Days WeekNum Days Phase Description1 Site Preparation Site Preparation 1/18/2021 4/1/2021 53.0 Construction DetailConstruction PhasePhase NumberPhase Name Phase Type Start Date0.00 0.00 0.00 0.00 0.00 0.0049.34 0.00 38.37 45.62 0.00 17.49NBio-CO2 Total CO2 CH4 N20 CO2ePercent Reduction0.00 0.00 0.00 0.00Exhaust PM10PM10 TotalFugitive PM2.5Exhaust PM2.5PM2.5 TotalBio- CO2ROG NOx CO SO2 Fugitive PM100.0000 16,080.643916,080.64394.2956 0.0000 16,188.03394.5436 2.5662 7.1097 0.7988 2.3620 3.1608Maximum 26.1180 70.8121 48.7484 0.16320.0000 16,080.643916,080.64394.2956 0.0000 16,188.03394.5436 2.5662 7.1097 0.7988 2.3620 3.16082021 26.1180 70.8121 48.7484 0.1632Total CO2 CH4 N2O CO2eYear lb/daylb/dayPM10 TotalFugitive PM2.5Exhaust PM2.5PM2.5 TotalBio- CO2 NBio- CO2Mitigated ConstructionROG NOx CO SO2 Fugitive PM10Exhaust PM10Appendix APage 58