Laserfiche WebLink
on site 0.07 0.48 0.02 0.02 68.0 <br />off site 0.04 0.39 0.00 0.00 152.5 <br />Phase 2 ‐ Building Construction 2022 0.11 0.87 0.02 0.02 220.5 <br />on site 0.01 0.08 0.00 0.00 13.5 <br />off site 0.00 0.00 0.00 0.00 1.5 <br />Phase 2 ‐ Paving 2022 0.01 0.08 0.00 0.00 15.0 <br />on site 0.69 0.22 0.01 0.01 29.4 <br />off site 0.00 0.00 0.00 0.00 10.9 <br />Phase 2 ‐ Architectural Coating 2022 0.70 0.23 0.01 0.01 40.3 <br />Phase 2 On Site   0.86 1.60 0.07 0.06 248.03 <br />Phase 2 Off Site 0.05 0.58 0.00 0.00 226.38 <br />Emissions amortized over 30 years:15.8 <br />10x Genomics Redevelopment Project ‐ Phase 3 Construction ‐ Alameda County, Annual <br />Date: 1/7/2021 7:39 AM <br />Project Phase 3 <br />Activity ROG NOx <br />PM10 <br />(Exhaust) <br />PM2.5 <br />(Exhaust) <br />CO2e <br />(Metric Tons) <br />on site 0.03 0.18 0.01 0.01 25.8 <br />off site 0.00 0.05 0.00 0.00 17.8 <br />Phase 3 ‐ Building Construction 2022 0.03 0.23 0.01 0.01 43.6 <br />on site 0.00 0.03 0.00 0.00 4.3 <br />off site 0.00 0.00 0.00 0.00 0.4 <br />Phase 3 ‐ Paving 2022 0.00 0.03 0.00 0.00 4.6 <br />on site 0.62 0.07 0.00 0.00 9.5 <br />off site 0.00 0.00 0.00 0.00 0.9 <br />Phase 3 ‐ Architectural Coating 2022 0.62 0.07 0.00 0.00 10.4 <br />Phase 3 On Site   0.65 0.28 0.01 0.01 39.50 <br />Phase 3 Off Site 0.00 0.05 0.00 0.00 19.12 <br />Emissions amortized over 30 years:2.0 <br /> 2022 on site 1.42 1.07 0.05 0.04 150.4 <br />2022 off site 0.05 0.44 0.00 0.00 184.0 <br />2022 TOTAL EMISSIONS 1.47 1.51 0.05 0.05 334.4 <br />ROG NOx <br />PM10 <br />(Exhaust) <br />PM2.5 <br />(Exhaust) <br />Total Emissions (tons)                  2.73               5.54               0.20               0.18  <br />Total Emissions (lbs)          5,461.04     11,080.14          393.84          368.16  <br />Average Daily Emissions (lbs/day)2                14.33             29.08               1.03               0.97  <br />Total Construction Workdays:381 <br />Average Daily Construction Emissions (lbs/day) <br />Appendix A Page 2