My WebLink
|
Help
|
About
|
Sign Out
20 Attachment 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
061521
>
20 Attachment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2021 4:43:16 PM
Creation date
6/8/2021 4:29:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
15Y
Document Relationships
20
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\061521
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on site 0.07 0.48 0.02 0.02 68.0 <br />off site 0.04 0.39 0.00 0.00 152.5 <br />Phase 2 ‐ Building Construction 2022 0.11 0.87 0.02 0.02 220.5 <br />on site 0.01 0.08 0.00 0.00 13.5 <br />off site 0.00 0.00 0.00 0.00 1.5 <br />Phase 2 ‐ Paving 2022 0.01 0.08 0.00 0.00 15.0 <br />on site 0.69 0.22 0.01 0.01 29.4 <br />off site 0.00 0.00 0.00 0.00 10.9 <br />Phase 2 ‐ Architectural Coating 2022 0.70 0.23 0.01 0.01 40.3 <br />Phase 2 On Site 0.86 1.60 0.07 0.06 248.03 <br />Phase 2 Off Site 0.05 0.58 0.00 0.00 226.38 <br />Emissions amortized over 30 years:15.8 <br />10x Genomics Redevelopment Project ‐ Phase 3 Construction ‐ Alameda County, Annual <br />Date: 1/7/2021 7:39 AM <br />Project Phase 3 <br />Activity ROG NOx <br />PM10 <br />(Exhaust) <br />PM2.5 <br />(Exhaust) <br />CO2e <br />(Metric Tons) <br />on site 0.03 0.18 0.01 0.01 25.8 <br />off site 0.00 0.05 0.00 0.00 17.8 <br />Phase 3 ‐ Building Construction 2022 0.03 0.23 0.01 0.01 43.6 <br />on site 0.00 0.03 0.00 0.00 4.3 <br />off site 0.00 0.00 0.00 0.00 0.4 <br />Phase 3 ‐ Paving 2022 0.00 0.03 0.00 0.00 4.6 <br />on site 0.62 0.07 0.00 0.00 9.5 <br />off site 0.00 0.00 0.00 0.00 0.9 <br />Phase 3 ‐ Architectural Coating 2022 0.62 0.07 0.00 0.00 10.4 <br />Phase 3 On Site 0.65 0.28 0.01 0.01 39.50 <br />Phase 3 Off Site 0.00 0.05 0.00 0.00 19.12 <br />Emissions amortized over 30 years:2.0 <br /> 2022 on site 1.42 1.07 0.05 0.04 150.4 <br />2022 off site 0.05 0.44 0.00 0.00 184.0 <br />2022 TOTAL EMISSIONS 1.47 1.51 0.05 0.05 334.4 <br />ROG NOx <br />PM10 <br />(Exhaust) <br />PM2.5 <br />(Exhaust) <br />Total Emissions (tons) 2.73 5.54 0.20 0.18 <br />Total Emissions (lbs) 5,461.04 11,080.14 393.84 368.16 <br />Average Daily Emissions (lbs/day)2 14.33 29.08 1.03 0.97 <br />Total Construction Workdays:381 <br />Average Daily Construction Emissions (lbs/day) <br />Appendix A Page 2
The URL can be used to link to this page
Your browser does not support the video tag.