Laserfiche WebLink
1,784.41091,784.4109 0.5771 1,798.83884.2000e-0040.7974 0.7978 6.0000e-0050.7336 0.7337Total 1.3426 12.4064 12.7812 0.01841,784.41091,784.4109 0.5771 1,798.83880.7974 0.7974 0.7336 0.7336Off-Road 1.3426 12.4064 12.7812 0.01840.0000 0.00004.2000e-0040.0000 4.2000e-0046.0000e-0050.0000 6.0000e-005CO2eCategory lb/daylb/dayFugitive DustPM2.5 TotalBio- CO2 NBio- CO2Total CO2 CH4 N2OSO2 Fugitive PM10Exhaust PM10PM10 TotalFugitive PM2.5Exhaust PM2.53.1 Mitigation Measures ConstructionWater Exposed AreaReduce Vehicle Speed on Unpaved Roads3.2 Site Preparation - 2021Unmitigated Construction On-SiteROG NOx CO10.80 7.30 20.00 LD_MixHDT_Mix HHDT7.30 20.00 LD_MixHDT_Mix HHDTArchitectural Coating4 37.00 0.00 0.00Paving4 10.00 0.00 0.00 10.8010.80 7.30 20.00 LD_MixHDT_Mix HHDT7.30 20.00 LD_MixHDT_Mix HHDTBuilding Construction9 185.00 77.00 0.00Grading5 13.00 0.00 188.00 10.8010.80 7.30 20.00 LD_MixHDT_Mix HHDT7.30 20.00 LD_MixHDT_Mix HHDTSite Preparation5 13.00 0.00 25.00Demolition13 33.00 0.00 744.00 10.80Worker Trip LengthVendor Trip LengthHauling Trip LengthWorker Vehicle ClassVendor Vehicle ClassHauling Vehicle ClassTrips and VMTPhase Name Offroad Equipment CountWorker Trip NumberVendor Trip NumberHauling Trip NumberArchitectural Coating Forklifts 1 4.00 89 0.20Architectural Coating Aerial Lifts 2 2.00 63 0.31Architectural Coating Cranes 1 8.00 231 0.29Paving Sweepers/Scrubbers 1 4.00 64 0.46Paving Cement and Mortar Mixers 1 2.00 9 0.56Building Construction Cement and Mortar Mixers 1 2.00 9 0.56Appendix APage 43