Laserfiche WebLink
STREET NAME BEGIN LOCATION END LOCATION AREA TREATMENT <br /> (SF) <br /> CAMINO CASA VIA DE LOS CERROS PASEO GRANADA 26,585 OUF <br /> BUENA <br /> PASEO SANTA VALLEY AV CORTE PONDEROSA 80,300 OUF <br /> CRUZ <br /> CORTEPASEO SANTA CRUZ END 10,845 OL <br /> PONDEROSA <br /> MIRADOR DR S/O ABBIE ST BERNAL AVE 25,365 OUF <br /> ANGELA ST FIRST STREET 100'E/O SECOND ST 16,600 PROF.MILUOL <br /> ANGELA ST 150'E/O WHITING ST MIRADOR DR 61,500 OUF <br /> LINDA WAY NEAL ST BONITA AVE 7,745 OUF <br /> DEL SOL AVE ENTRADA DR END 9,890 OUF <br /> LAPIS LANE CRYSTAL LN END 7,165 OL/F <br /> CRYSTAL CT LAPIS LN END 12,335 OUF <br /> CRYSTAL LN INDEPENDENCE DR LAPIS LN 15,490 OUF <br /> INDEPENDENCE BERNAL AVE 33'S/O INDEPENDENCE CT 57,330 OUF <br /> DR <br /> INDEPENDENCE 33'S/O INDEPENDENCE CT END 55,170 OUF <br /> DR <br /> CRELLIN RD TOURIGA DR GREY EAGLE 120,820 OL/F <br /> ARBOR DR MATARO CT RED FEATHER DR 68,640 OUF <br /> HEARST DR BERNAL AVE E/O CONCORD ST 86,855 OUF <br /> RED FEATHER DR ARBOR DR END 11,740 MILUFILL <br /> The second component of the project consists of preparatory work for approximately <br /> 1.45 million square feet of roadway scheduled for slurry sealing later this year. This <br /> work consists of pavement repair and crack sealing. Pavement repair involves removing <br /> 4 to 6 inches of the existing pavement section down to the roadway aggregate base <br /> material and replacing it with new asphalt concrete with the same thickness as <br /> removed. This is done when the pavement has failed in isolated areas and before the <br /> entire street surface is slurry sealed. This is the same repair as performed on the <br /> reconstructed streets and as described above but, generally, the overall condition of the <br /> streets that will be slurry sealed instead of reconstructed is better. Crack sealing <br /> involves cleaning the pavement cracks in preparation for applying a sealant and <br /> smoothing the applied sealant so that the material is flush with the existing asphalt <br /> concrete surface. <br /> The following streets are included in the second component of work and will be slurry <br /> sealed later this year under a separate project, which is currently in the bidding process. <br /> STREET NAME BEGIN LOCATION END LOCATION AREA(SF) <br /> BLACK AVE HOPYARD RD CRESTLINE RD 25,211 <br /> BLACK AVE GREENWOOD RD LOGANBERRY WY(EAST) 28,341 <br /> BLACK AVE LOGANBERRY WY(EAST) SANTA RITA RD 54,529 <br /> DEL VALLE PKWY HOPYARD RD 37 FT W/O HOMETOWN WY 131,295 <br /> PETERS AVE DIVISION ST OLD BERNAL AVE 63,820 <br /> PLEASANTON AVE ST MARY ST DIVISION ST 5,916 <br /> PLEASANTON AVE DIVISION ST ROSE AVE 13,659 <br /> Page 4 of 7 <br />