My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1 EXHIBIT C
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
060121
>
14 ATTACHMENT 1 EXHIBIT C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 11:44:54 AM
Creation date
5/20/2021 5:20:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/1/2021
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT A
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT B
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT D
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 Water Supply Reliability Analysis..................................................................................................1 <br />2.0 Annual Water Supply and Demand Assessment Procedures...........................................................2 <br />2.1 Decision -Making Process..................................................................................................................2 <br />2.2 Key Data Inputs.................................................................................................................................4 <br />2.3 Assessment Methodology................................................................................................................ 5 <br />3.0 Six Standard Water Shortage Levels..............................................................................................5 <br />4.0 Shortage Response Actions and Effectiveness...............................................................................7 <br />4.1 Demand Reduction...........................................................................................................................7 <br />4.2 Additional Mandatory Restrictions................................................................................................ <br />10 <br />4.3 Supply Augmentation and Other Actions....................................................................................... <br />10 <br />4.4 Operational Changes...................................................................................................................... <br />11 <br />4.5 Emergency Response Plan.............................................................................................................. <br />11 <br />4.5.1 Interrupted Supply from Zone 7........................................................................................... <br />12 <br />4.5.1.1 Unavailable SWP Water.............................................................................................. <br />12 <br />4.5.1.2 Unavailable Zone 7 Water........................................................................................... <br />12 <br />4.5.2 Area -Wide Electrical Power Failure..................................................................................... <br />12 <br />4.5.3 Earthquake............................................................................................................................ <br />13 <br />5.0 Communication Protocols...........................................................................................................13 <br />5.1 Communication for Foreseeable Events........................................................................................ <br />13 <br />5.2 Communication for Unforeseeable Events.................................................................................... <br />14 <br />6.0 Compliance and Enforcement.....................................................................................................14 <br />7.0 Legal Authorities........................................................................................................................15 <br />8.0 Financial Consequences of WSCP................................................................................................16 <br />9.0 Monitoring and Reporting..........................................................................................................16 <br />10.0 WSCP Refinement Procedures...................................................................................................17 <br />11.0 Special Water Feature Distinction.............................................................................................17 <br />12.0 Plan Adoption, Submittal, and Availability................................................................................17 <br />LIST OF TABLES <br />Table 1. Schedule of Annual Water Supply and Demand Assessment Activities ................................... 3 <br />Table 2. Schedule of Decision -Making Activities if Water Shortage Condition Exists ............................4 <br />Table 3. Water Shortage Contingency Plan Levels <br />(DWR Table 8-1)....................................................................................................................... 6 <br />Table 4. Water Shortage Contingency Plan Demand Reduction Actions <br />(DWR Table 8-2)....................................................................................................................... 8 <br />i City of Pleasanton <br />N-680-60-20-04-WP-R-680-2020UWMP <br />Last Revised: 05-05-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.